Installation Standard Work Checklist - Heat & Glo SL-550F-LP Installation Manual

Hide thumbs Also See for SL-550F-LP:
Table of Contents

Advertisement

Installation Standard Work Checklist

This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in this
installation manual.
Customer:
Lot/Address:
Model (circle one): SL-550F
SL-750F
WARNING! Risk of Fire or Explosion! Failure to install appliance according to these instructions can
lead to a re or explosion.
Appliance Install
Veri ed that the chase is insulated and sealed. (Pg. 10)
Veri ed clearances to combustibles. (Section 3)
Fireplace is leveled and secured. (Pg. 32)
Venting/Chimney Section 7 (Pg 33-38)
Venting con guration complies to vent diagrams.
Venting installed, locked and secured in place with proper clearance.
Firestops installed.
Attic insulation shield installed.
Exterior wall/Roof ashing installed and sealed.
Terminations installed and sealed.
Electrical Section 8 (Pg 39-41)
120VAC unswitched power provided to the appliance.
Switch wires properly installed.
Gas Section 9 (Pg 42-43)
Proper appliance for fuel type.
Was a conversion performed?
Leak check performed and inlet pressure veri ed.
Veri ed proper air shutter setting for installation type.
Finishing Section 10 (Pg 44-46)
Combustible materials not installed in non-combustible areas.
Veri ed all clearances meet installation manual requirements.
Mantels and wall projections comply with installation manual requirements.
Appliance Setup Section 11 (Pg 47-55)
All packaging and protective materials removed (inside & outside of appliance).
Refractories, logs, media and embers installed correctly.
Glass assembly installed and secured.
Accessories installed properly.
Mesh, doors, or decorative front properly installed.
Manual bag and all of its contents are removed from inside/under
the appliance and given to party responsible for use and operation.
Started appliance and veri ed no gas leaks exist.
Hearth & Home Technologies recommends the following:
• Photographing the installation and copying this checklist for your le.
• That this checklist remain visible at all times on the appliance until the installation is complete.
Comments: Further description of the issues, who is responsible (Installer/ Builder/ Other Trades, etc) and corrective
action needed _____________________________________________________________________________________
_________________________________________________________________________________________________
_________________________________________________________________________________________________
Comments Communicated to party responsible ____________________ by ______________________on ___________
= Contains updated information.
ATTENTION INSTALLER:
Follow this Standard Work Checklist
SL-550F-LP
SL-750F-LP
(Builder / Gen. Contractor/) (Installer)
Heat & Glo • SL-550F, SL-750F Installation Manual • 2297-980 Rev. H • 3/16
Date Installed:
Location of Fireplace:
Installer:
Dealer/Distributor Phone #
Serial #:
YES
IF NO, WHY?
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
(Date)
2297-982C 12/14
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-550fSl-750fSl-750f-lp

Table of Contents