Switch Box; Heat Pump Controller; Transport - Dimplex LA 17PS Installation And Operating Instructions Manual

Air-to-water heat pump for outdoor installation
Table of Contents

Advertisement

Available languages

Available languages

3.2

3.2 Switch Box

The switch box is located in the heat pump. All electrical compo-
nents are accessible after the front cover and the switch box
cover have been removed.
The switch box contains the supply connection terminals, the
plug connector for the control line, as well as the power contac-
tors and the soft starter unit.

3.3 Heat Pump Controller

Use the heat pump controller included in the scope of supply to
operate the air-to-water heat pump.
The heat pump controller is a convenient electronic regulation
and control device. It controls and monitors the entire heating
system on the basis of the external temperature, including do-
mestic hot water preparation and safety systems.
The customer must install the return temperature sensor and the
external temperature sensor, which are supplied with the heat
pump controller / with these instructions together with the neces-
sary fixing accessories.
The enclosed operating instructions describe the function and
use of the heat pump controller.
EN-4
4

Transport

ATTENTION!
Never install the device in rooms in which there are any permanent
ignition sources.
ATTENTION!
When transporting the heat pump, ensure that it is not tilted more than
45° (in any direction).
Use a wooden pallet for transporting the heat pump to the final in-
stallation location. The basic device can be transported with a lift
truck, hand truck or by means of 3/4" pipes fed through the holes
in the base plate or frame.
The heat pump and the transport pallet are joined by four transit
bolts. These must be removed.
Before using the transport holes in the frame, it is necessary to
remove the lower side panel assemblies. This is done by loosen-
ing each of the two screws at the base and then withdrawing the
panels by unhooking them from above. Rehang the panels by
gently pushing them in an upwards direction.
Be careful not to damage any components when inserting the
pipes through the frame.
At the installation location, 8 black dust caps, which are included
in the packaging of the device, must be snapped into the trans-
port holes.
Opening the cover
Closing the cover

Advertisement

Table of Contents
loading

This manual is also suitable for:

La 26psLa 22ps

Table of Contents