Checking The Wheels; Checking And Adjusting The Steering Head; Steering Ring Nut Adjustment Steps - Yamaha yz250 2015 Owner's Manual

Table of Contents

Advertisement

Spoke nipple wrench:
YM-01521/90890-01521
Spoke:
3 Nm (0.3 m•kg, 2.2
ft•lb)

CHECKING THE WHEELS

1. Inspect:
• Wheel runout
Elevate the wheel and turn it.
Abnormal runout → Replace.
2. Inspect:
• Bearing free play
Exist play → Replace.
CHECKING AND ADJUSTING THE
STEERING HEAD
1. Place a stand under the engine to
raise the front wheel off the
ground. WARNING! Securely
support the vehicle so that
there is no danger of it falling
over.
2. Check:
• Steering stem
Grasp the bottom of the forks and
gently rock the fork assembly
back and forth.
Free play → Adjust steering head.
3. Check:
• Steering smooth action
Turn the handlebar lock to lock.
Unsmooth action → Adjust steer-
ing ring nut.
4. Adjust:
• Steering ring nut
Steering ring nut adjustment
steps:
a. Remove the number plate.
b. Remove the handlebar and upper
bracket.
c. Loosen the steering ring nut "1"
using the steering nut wrench "2".
Steering nut wrench:
YU-A9472/90890-01403
d. Tighten the steering ring nut "3"
using steering nut wrench "4".
• Apply the lithium soap base grease
on the thread of the steering stem.
• Set the torque wrench to the steer-
ing nut wrench so that they form a
right angle.
Steering nut wrench:
YU-A9472/90890-01403
Steering ring nut (initial
tightening):
38 Nm (3.8 m•kg, 27
ft•lb)
e. Loosen the steering ring nut one
turn.
3-17
CHASSIS
f. Retighten the steering ring nut us-
ing the steering nut wrench.
Avoid over-tightening.
Steering ring nut (final
tightening):
7 Nm (0.7 m•kg, 5.1
ft•lb)
g. Check the M stem by turning it
lock to lock. If there is any binding,
remove the steering stem assem-
bly and inspect the steering bear-
ings.
h. Install the washer "5", upper
bracket "6", washer "7", steering
stem nut "8", handlebar "9", han-
dlebar upper holders "10" and
number plate "11".
• The handlebar upper holder should
be installed with the punched mark
"a" forward.
• Install the handlebar so that the
marks "b" are in place on both
sides.
• Install the handlebar so that the pro-
jection "c" of the handlebar upper
holder is positioned at the mark on
the handlebar as shown.
• Insert the end of the fuel breather
hose "12" into the hole in the steer-
ing stem.
First tighten the bolts on the front
side of the handlebar upper holder,
and then tighten the bolts on the
rear side.
Steering stem nut:
145 Nm (14.5 m•kg, 105
ft•lb)
Handlebar upper holder:
28 Nm (2.8 m•kg, 20
ft•lb)
Pinch bolt (upper brack-
et):
21 Nm (2.1 m•kg, 15
ft•lb)
Number plate:
7 Nm (0.7 m•kg, 5.1
ft•lb)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yz250f2 20152011 yz2502011 yz250a12011 yz250aYz250(b)

Table of Contents