Removing Of Major Parts - Sharp LC-20S2U-S Service Manual

Hide thumbs Also See for LC-20S2U-S:
Table of Contents

Advertisement

1. Remove the stand fixing screws (4 pcs.).
2. Remove the terminal cover.
3. Remove the terminal section fixing screws (3 pcs.).
4. Remove the cabinet B fixing screws (9 pcs.).
5. Remove the cabinet B after opening from the direction of an arrow.
6. Remove the reinforcement angle fixing screws (2 pcs.).
8. Detach the connector from each PWB.
Sub PWB
P6706
P6700
P6706
7
P6701
P6702
7
SC3401
7
P6703
P5602
P6704
7
P4003
7
Inverter PWB
R/C, LED PWB

REMOVING OF MAJOR PARTS

Terminal Cover
6
Reinforcement Angle
P3604
7
P3701
P3603
P3801
P3303
P3302
P701
P1201
SC1204
7
7
SC2001
SC1202 SC1203
7
P2001
P4001
7
4
2
3
1
Stand
Main PWB
9
LC-20S2U-S
Cabinet A
5
Cabinet B

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents