4. Press down on the locking latch and move the locking handle to the open position,
5. Slide the power supply into the chassis and fully close the locking handle.
6. Plug one end of the power cord for the new power supply into the corresponding
7. Verify that the dc power and ac power LEDs on the front of the power supply are
8. Continue with "Completing the installation".

Completing the installation

This section provides the information needed to complete the installation.

Installing the server top cover and bezel

Complete the following steps to install the server top cover and bezel:
1. Before installing the cover, check that all internal cables, adapters, and other com-
2. Move the cover-release latch to the open (up) position.
Power supply 1
Note: The power supplies are numbered from left to right (1 to 3) as viewed from
the front of the server. Power supplies do not have to be installed in a par-
ticular sequence.
Attention: To ensure proper system cooling, do not leave the filler panel off the
server for more than 30 minutes.
as shown in the illustration.
connector on the back of the server (connectors are numbered 1 through 3 from
top to bottom, as illustrated at "Cabling the server" on page 21). Plug the other
end of the power cord into a properly grounded electrical outlet.
lit, indicating that the power supply is operating properly.
ponents are installed and seated correctly and that you have not left loose tools or
parts inside the server.
Power supply 3
Locking latch
Power supply 2
DC power LED
Chapter 2. Installing options
Locking handle
AC power LED
19