Note:
To install an additional power supply:
18
IBM® Netfinity® 6000R Installation Guide
The illustrations in this document might differ slightly from your hardware.
1. Review the information in "Safety" on page v.
2. Remove the filler panel.
3. Place the handle on the power supply in the open (down) position.
4. Slide the power supply into the chassis and press the handle to the closed (up)
position.
5. Plug the power cord into the corresponding outlet on the rear of the server; then,
into a properly grounded electrical outlet.
6. Verify that the DC Power light and the AC Power light on the power supply are
lit, indicating that the power supply is operating properly.
Filler panel
AC power light
Power supply
Power supply handle
DC power ligh