Installation Preparation; Tools And Materials Required; Remove Packaging - Monogram ZJ7000 Installation Instructions Manual

Electric warming drawer
Hide thumbs Also See for ZJ7000:
Table of Contents

Advertisement

TOOLS REQUIRED
Hand Saw
Drill and
1/16" Bit
Phillips Screwdriver
Cut Resistant Gloves

REMOVE PACKAGING

Place Warming Drawer on carton or protective pad to prevent damage to drawer front or finished flooring.

Installation Preparation

Safety Glasses
Measuring Tape
Level
6
MATERIALS REQUIRED (provided)
4 Wood Screws
MATERIALS REQUIRED (not provided)
2x2 or 2x4
Wood Block
for Anti-Tip
Security
Adhesive or other hardware for installing
runners or shelf to support warmer drawer
Runners must be level, rigidly mounted and capable
of supporting 150 pounds.
2x2 or 2x4
Lumber for
Runners

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zw9000

Table of Contents