Adjustments - Scotsman C2648 Service Manual

Modular cuber induding prodigy plus
Hide thumbs Also See for C2648:
Table of Contents

Advertisement

C2648 Prodigy and Prodigy Plus Service Manual

Adjustments

Bridge Thickness - For A Service Tech Only
1. Push and hold Off till the machine stops.
2. Remove evaporator cover.
3. Remove left curtain.
4. Use a box wrench and rotate the bridge thickness
adjustment screw in 1/8 turn increments CW
to increase bridge thickness. Rotate CCW to
decrease bridge thickness.
Caution: Do not make the bridge too thin or the
machine will not harvest properly. Bridge thickness
adjustments are not covered by warranty.
5. Return curtain to its normal position.
6. Push and release the On button. Check next
harvest of ice. Repeat steps 1-6 if needed.
Water purge setting
The water purge is factory set to the automatic
position, suitable for most water conditions. The
setting can be changed to one of 5 manual settings or
left on automatic.
purge
1 - Minimum
setting
Water
RO water or
Type
equivalent
To set:
1. Switch the machine OFF by holding the Off button
in until a number or the letter A shows on the
display.
2. Press and release the On button repeatedly until
the number on the display corresponds to the
desired setting.
3. Press and release the Off switch again to return to
the normal control state.
2 - Moderate
3 - Standard
Factory
Setting for
typical water
January 2015
Page 17
1/8 to 3/16" bridge
Too Big
Just Right,
Small Cube
Ice Bridge Thickness Measurement
Ice Thickness Sensor
4 - Heavy
5 - Maximum
High TDS
water
Just Right,
Too Small
Medium Cube
A - Automatic
Any with
conductivity not
less than 10
microSiemens/cm

Advertisement

Table of Contents
loading

Table of Contents