Connect The Sid To The Intuity System; Connect The Sid Power Cord - NEC 2400 Integration Manual

Intuity integration with nec neax 2400 switch
Table of Contents

Advertisement

Connect the SID to the INTUITY
System
This task requires you to connect the 6' RS-232 cable to the SID and to the
INTUITY System and should be completed by the AT&T installation technician.
The cable connects directly to the SID and connects to the INTUITY system
through a 6-to-25-pin adaptor and a modular cable. Use the following
instructions to connect the SID to the INTUITY System.
1. Connect the 25-pin RS-232 connector to Link A on the back of the SID.
Figure 4-3 shows you the location of Link A.
2. Connect the 25-pin end of the 6-to-25-pin adaptor to the free end of the
RS-232 cable.
3. Plug the modular cable into the 6-to-25-pin adaptor.
4. Plug the free end of the modular cable into the multiport serial card in the
MAP/5, MAP/40, or MAP/100 platform.
Proceed to the next section.

Connect the SID Power Cord

The AT&T installation technician or the customer must complete this task.
1. Plug the female end of the power cord into the AC power-in socket on the
SID, shown in Figure 4-3.
2. Plug the male end of the power cord into the AC outlet provided by the
customer.
3. Locate the power switch on the back of the SID, shown in Figure 4-3.
4. Toggle the power switch to the ON position.
When you turn on the power switch, the Status LED on the front of the SID
illuminates.
You have completed the hardware installation steps required for the NEAX 2400
integration. Proceed to Chapter 5, "Installing SID Software on the INTUITY
System", in this document.
NOTE:
If you are connecting the SID to a MAP/5 through the COM1 port,
you do not need the adaptor. Connect the free end of the RS-232
cable to the COM1 port.

Connect the SID to the INTUITY System

Issue 2 December 1995
4-9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Neax 2400

Table of Contents