COMBUSTION CHAMBER

Secondary heat exchanger:
1
Unscrew screws (B) and remove flue
manifold access cover (A).
Check that all the baffles and retainer are
correctly fitted to the secondary heat
exchanger:
32/50kW*
50/70kW
*Five of the slots do not have baffles.
Combustion chamber:
2
Remove the retaining nuts and washers (D).
Remove combustion chamber access
door (C).
3
Remove the transit packaging and ensure
the baffles (E) and baffle retainer (F) are
correctly fitted for the boiler output as
shown in the plan views below.
4
Refit combustion chamber door (C).
IMPORTANT: Secure with nuts and
washers (D) and tighten gradually in the
sequence (1-6) shown until the chamber
door is firmly secured, do not over tighten
the nuts.
FRONT
SLOTS DOUBLE
SINGLE
BAFFLES
BAFFLES
25
10
N/A
31
15
1
COMBUSTION CHAMBER
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar utility50/70

Table of Contents