Layout & Components - Worcester GREENSTAR UTILITY 32/50 Instruction Manual

Installation, commissioning & servicing floor standing oil-fired condensing boiler conventional flue & room sealed flue
Hide thumbs Also See for GREENSTAR UTILITY 32/50:
Table of Contents

Advertisement

8 716 109 711 b 07.10
14/7/10
Burner Cover
cut-away
view
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/25
8 716 109 711B 07.2010
09:59
Page 7
LAYOUT & COMPONENTS
The diagram opposite excludes the top, front
and RH side casing panels.
1
CH THERMOSTAT CONTROL
2
RESET BUTTON BOILER OVERHEAT
3
RESET BUTTON FLUE OVERHEAT
4
CONTROL BOX ASSEMBLY
5
CASING SIDE PANEL
6
CASING SUPPORT PANEL
7
CLIP - FIRE SENSOR
8
CONTROL, AUTOMATIC HIGH LIMIT &
MANUAL HIGH LIMIT THERMOSTATS
9
CLIP - POWER CABLE
10 FLUE MANIFOLD ACCESS COVER
11 CH RETURN PIPE
12 MANUAL RESET FLUE OVERHEAT
THERMOSTAT
13 FLUE MANIFOLD
14 FLUE GAS SAMPLING POINT
15 - 16 SECONDARY HEAT EXCHANGER
17 MANUAL AIR VENT - SECONDARY
HEAT EXCHANGER
18 MANUAL AIR VENT - SECONDARY TO
PRIMARY HEAT EXCHANGER
RETURN PIPE
19 SECONDARY TO PRIMARY HEAT
EXCHANGER RETURN PIPE
20 DRAIN-SECONDARY HEAT
EXCHANGER
21 CH FLOW CONNECTION LEFT &
RIGHT HAND SIDE
22 CONDENSATE OUTLET
23 INTERNAL CONDENSATE TRAP
24 CONDENSATE DRAIN
25 CONDENSTAE DRAIN PUSH-FIT
CONNECTOR
26 OPTIONAL COLD FEED/DRAIN LEFT
& RIGH HAND SIDE
27 PRIMARY HEAT EXCHANGER
28 BASE PLATE
29 COMBUSTION CHAMBER ACCESS
DOOR
30 OIL DRIP TRAY
31 TOP FRONT PANEL
30a RIELLO RDB 3.2 (32/50)
RIELLO RDB 4.2 (50/70)
i)
Control box
ii)
Motor
iii)
Air intake casing
iv)
Oil pump
v)
Combustion head
30b BENTONE STERLING 133 (32/50)
BENTONE STERLING 146 (50/70)
i)
Control box
ii)
Motor
iii)
Air intake casing
iv)
Oil pump
v)
Combustion head
31 LOCKOUT INDICATOR/RESET
BUTTON
32 CLIP - AIR INTAKE HOSE
33 AIR INTAKE HOSE
LAYOUT & COMPONENTS
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar utility50/70

Table of Contents