STARTING THE APPLIANCE
09:59
Page 36
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716
STARTING THE APPLIANCE
Central heating:
1 Open all radiator valves.
Set room thermostat to maximum.
Set programmer to ON for CH &
DHW (if applicable).
Turn the boiler control thermostat (A)
to max.
The burner should be ON with the circulating
pump.
Ensure all radiators are heating up evenly
and balance the system to the temperature
difference required for the heating flow and
return according to the heating load.
2 Set the room thermostat to minimum.
The burner and circulating pump should
be off.
3 Check that any other controls that are fitted
to the system are operating properly.
109 711B 07.2010