Clearance To Combustibles; Floor Protection - Regency F300B Owners & Installation

Gosford freestanding wood fire
Hide thumbs Also See for F300B:
Table of Contents

Advertisement

Universal
Universal
Default Kit
Default Kit
*(1)
A
390mm
390mm
B
280mm
160mm
C
200mm
200mm
D
280mm
160mm
E
123mm
123mm
F
380mm
380mm
G
1015mm
1015mm
H
1200mm
1080mm

Floor Protection

A combustible floor must be protected by non-combustible material (like
tile, concrete board, or as defined by local codes) extending beneath
the heater as follows;
From Sides:123mm
From Front: 380mm
From Back: As per D above.
The floor protector should consist of 12mm thick cement fibre sheet
which has a thermal resistance of 0.8m
fibre sheet.
IMPORTANT
* (1) The Universal Triple Skin Default Kit when fitted with either
1 or 2 lengths of 130 degree solid back 900mm decromesh.
* (2) The Universal Triple Skin Default Kit with 2 x 900mm 130
degree solid back decromesh and 1 x 450mm stainless shield fitted
between active flue and decromesh.
* (3) The Universal Triple Skin Default Kit with 1 x 130 degree
stainless shield x 900mm or 1 x 900mm 130 degree solid back
decromesh + 1 x 450 mm stainless shield fitted between active flue
and decromesh.
* (4) The AHD Special Insulated Flue Kit must be installed with a
40mm air gap around the flue to any combustible surfaces and the
ceiling ring must be spaced as such to provide an air gap of 10mm
to the ceiling.
The AHD Special Insulated flue kit must be installed with a perfo-
rated ceiling plate with 15 x 11mm holes and a 250mm diameter x
150mm high heat shield positioned directly above the ceiling plate.
Regency Gosford Freestanding Wood Fire
MINIMUM CLEARANCE TO
COMBUSTIBLE MATERIALS
Universal
AHD Special
Default Kit
Insulated Kit
*(2)
*(3)
390mm
420mm
220mm
220mm
200mm
200mm
220mm
220mm
123mm
123mm
380mm
380mm
1015mm
1015mm
1140mm
1140mm
k/w for 4mm sheets of cement
2
*(3)
D
H
A
D
C
The flue pipe shall extend not less
than 4.6m above the top of the
NOTE: Installation must be carried
out by a licensed installer in
INSTALLATION
G
E
All measurement are in mm
Tolerance±4%
版本号
更改描述
设计
审核
工艺
C
G
H
E
All measurement are in mm
Tolerance±4%
版本号
设计
审核
工艺
floor protector.
accordance
with AS/NZS 2918:2001.
B
E
F
開能
上海
Canature
Shang
材料
签名
年月日
标准化
原图号/物料号
数量
1
共 张
张 用于第
批准
1
F
E
開能
Canature
Sha
材料
更改描述
签名
年月日
标准化
原图号/物料号
数量
1
共 张
张 用于
批准
1
7

Advertisement

Table of Contents
loading

Table of Contents