Boiler Mounting Bracket And Frame; Installation On Wood Studs; Installation On Metal Studs - Viessmann B2HB 45 Installation Instructions Manual

B2hb series vitodens 200-w wall-mounted, gas-fired condensing boiler
Table of Contents

Advertisement

Boiler Connections
Vitodens 200-W B2HB 45, 57 Installation
Wall Mounting
(continued)
Boiler mounting bracket
Install the boiler mounting bracket to the wall studs.
Ensure the mounting bracket is level.
To mount on wood or metal studs a cross bar or frame
may be required as reinforcement. The wall and studs
must be capable of supporting a minimum of 210 lb.
(95 kg).
For construction materials, use fixings that are suitable
for 210 lb (95 kg) loads.

Installation on wood studs

Install mounting bracket on wood studs as per illustration.
Drill
3
/
" pilot holes to insert mounting bolts. Ensure that
16
holes are located in the center of each wood stud. Secure
with bolts to wooden studs as shown.

Installation on metal studs

install mounting bracket on metal studs as per illustration.
Drill f" pilot holes to insert anchors. Ensure that holes are
located in the center of each metal stud. Use appropriate
fasteners to mount to metal studs (not supplied). Secure
with bolts to metal studs as shown. Ensure the mounting
bracket is level.
14

Advertisement

Table of Contents
loading

This manual is also suitable for:

B2hb 57

Table of Contents