ICP N9MP1 Service Manual page 27

Table of Contents

Advertisement

Single Stage Multi Position Furnace
Figure 34
Horizontal Left Installations (Dual Certified *9MPD(A1) Models)
Air Intake Coupling
Vent Pipe
Supply
Air
Vent Fitting
& Clamps
Vent Pipe
Grommet
DRAIN SIDE VIEW
Rotate downward
20° to 30°
Horizontal Left Installations - (Dual Certified *9MPD
Relocate the plastic caps and clamps on the condensate drain trap
from the vertical drain stub to the horizontal drain stubs. Secure the
clamps tightly to prevent condensate leakage.
Mount the condensate drain trap in a vertical position to the left side
of the furnace using the two screws and gasket that are provided.
Note: The condensate trap will be located under the furnace in a ver-
tical position when the furnace is placed horizontally on the left side.
If needed, remove the hole plugs from the furnace side panel and
relocate to the open set of holes in the opposite side panel. Drill two
7
/
² diameter holes in the casing using the condensate trap as the
64
template.
Connect the vent fitting and the 90° elbow to the combustion blower
using the rubber coupling and clamps.
NOTE: The vent fitting MUST be installed with the airflow marking
arrow pointed toward the vent pipe, with the drain stub at a 20 to 30°
downward slope.
Combustion Air Pipe, (optional)
Plastic Caps
Rubber
Plug
Gas Pipe
Grommet
5
/
² ² ² ² Hose & Clamps
8
Rubber Coupling
Drain Line
& Clamps
Pressure Switch Hose,
Transition Box
Blower
Pressure Switch,
Blower
90° ° ° ° Elbow
Condensate
Trap & Gasket
Plastic Caps
) (See Figure 34)
Plug the upper drain stub on the vent fitting with the rubber plug. Use
a blunt pointed screwdriver to push the plug into the stub.
3
Connect the
/
² OD rubber hose with the 90° bend to the drain stub
4
on the bottom of the plastic transition box and secure with a
clamp.
Route the hose to the large drain stub on the condensate trap. Cut
off excess hose and discard. Connect the hose to the drain stub on
the trap and secure with a
5
Connect the
/
² OD rubber hose with the 90° bend to the small drain
8
stub on the trap and secure with a
Route the hose to the lower drain stub on the vent fitting. Cut off ex-
cess hose and discard. Connect the hose to the drain stub on the
vent fitting and secure with a
NOTE: Ensure hoses maintain a downward slope to the conden-
sate trap with no kinking or binding for proper condensate drainage.
25
Service Manual
Pressure Switch,
Transition
Combustion
Blower
Combustion Blower
Mounting Screws
(4)
Pressure Switch Hose,
Transition
3
/
² ² ² ² Hose & Clamps
4
3
/
² clamp.
4
5
/
² clamp.
8
5
/
² clamp.
8
Return
Air
dwg 25--23--54
3
/
²
4
440 08 2001 02

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

N9mp2T9mpdH9mpdC9mpd

Table of Contents