Worcester Greenstar 25Si Compact Installation, Commissioning And Servicing Instructions page 69

Wall hung rsf gas fired condensing combination boiler
Hide thumbs Also See for Greenstar 25Si Compact:
Table of Contents

Advertisement

eco
°C
reset
ok
°F
t01
e
max
t01
eco
reset
ok
°F
t01
e
max
t01
eco
°C
reset
ok
°F
Test 1
e
max
t01
Fig. 132 Resetting test
Note that it could be up to 10 seconds after the button is
Test
pressed before the selected component responds.
t1
Igniter test.
Checking the igniter
spark.
t2
Fan test.
Checking the basic fan
operation.
t3
Pump test.
Checking the basic pump
operation.
t4
Three way valve test.
Test the operation of the
diverter valve.
t6
Ionisation oscillator test.
Tests the flame detection
circuit.
Table 31 Test menu
Greenstar Si Compact
ErP
- 6 720 813 278 (2015/07)
2
1
1
3
0
bar
4
1.
min
max
°C
°F
2
1
1
3
0
bar
4
1.
min
max
°C
°F
2
1
1
3
0
4
bar
1.
min
max
°C
°F
The igniter will spark for a maximum
of 30 seconds. The spark will be
audible if the igniter is OK.
The fan will run for a maximum of 30
seconds. If the fan is OK then the fan
will be heard running.
The pump will run for a maximum of
45 seconds. If the pump is OK then
the pump will be heard running.
When 1 is selected via the test menu
the diverter valve will move to the
DHW position. When 0 is selected
the valve will move to CH position.
Ionisation circuit is switched on. An
A.C. voltage of approximately 150
Volts can be measured between the
ionisation probe and earth.
FAULT FINDING AND DIAGNOSIS
69

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 30si compact

Table of Contents