Drain Tap; Ch Pressure Relief Valve; Dhw Pressure Relief Valve; Dhw Plate Heat Exchanger - Worcester Greenstar 25Si Compact Installation, Commissioning And Servicing Instructions

Wall hung rsf gas fired condensing combination boiler
Hide thumbs Also See for Greenstar 25Si Compact:
Table of Contents

Advertisement

SERVICE AND SPARES

7.8.23 DRAIN TAP

▶ Ensure that the boiler is full drained down.
▶ The drain tap rotates anti-clockwise for a ¼ turn to open.
1. Rotate the drain tap fully anti-clockwise passed the ¼ turn stop point
to release.
2. Push in and withdraw from the housing.
1.
2.
Fig. 108 Drain tap

7.8.24 CH PRESSURE RELIEF VALVE

▶ Isolate the boiler and ensure that the boiler is fully drained.
1. Release the knurled connector from the bottom of the PRV.
2. Pull the captive clip to the left to release the PRV.
3. Pull the Central Heating pressure relief valve out of the housing.
▶ Replace in reverse order, secure with the clip and mounting screws.
2.
3.
1.
Fig. 109 PRV
54

7.8.25 DHW PRESSURE RELIEF VALVE

Before removal:
▶ Isolate the electrical power to the boiler.
▶ Drain the boiler.
▶ Isolate the cold water mains.
1. Release the retaining clip
2. Pull the pressure relief valve (1) with the deflector (2) from the
housing.
▶ When replacing the DHW pressure relief valve, re-use the deflector
from the old PRV.
2.
Fig. 110 DHW PRV

7.8.26 DHW PLATE HEAT EXCHANGER

Before removal:
▶ Isolate the electrical power to the boiler.
▶ Isolate the cold water mains and drain DHW circuit
within the boiler.
▶ Drain the boiler.
1. Undo and remove the retaining screw.
2. Rotate the left hand side of the heat exchanger towards you and slide
out to the left.
2.
1.
Fig. 111 Remove plate heat exchanger.
▶ When replacing the heat exchanger, ensure that any seals that have
been disturbed are replaced.
Greenstar Si Compact
1.
1
2
ErP
- 6 720 813 278 (2015/07)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 30si compact

Table of Contents