Indoor Unit Installation - Daikin FAY71LVE Installation Manual

Split system air conditioners
Hide thumbs Also See for FAY71LVE:
Table of Contents

Advertisement

• Where pipe between indoor and outdoor units is possible within the allowable limit.
(Refer to the installation manual of the outdoor unit.)
• Install the indoor and outdoor units, power cable and transmission wiring, at least 1 m from TVs and
radios, to prevent distorted pictures and static. (Depending on the type and source of the electrical
waves, static may be heard even when more than 1 m away.)
• Install the indoor unit no less than 2.5 m above the floor. Where unavoidably lower, take what measures
are necessary to keep hands out of the air inlet.
• Where the cool (warm) air reaches all across the room.
[ Space required for installation (mm) ]
50
(2) Consider whether the place where the unit will be installed can support the full weight of the unit,
and reinforce it with boards and beams, etc. if needed before proceeding with the installation.
Also, reinforce the place to prevent vibration and noise before installing.
(The installation pitch can be found on the paper pattern for installation (3), so refer to it when con-
sidering the necessity for reinforcing the location.)
(3) The indoor unit may not be directly installed on the wall. Use the attached installation panel (1)
before installing the unit.

4. INDOOR UNIT INSTALLATION

• Use only accessories and parts which are of the designated specification when installing.
CAUTION
• Install so that the unit does not tilt to either side or forward.
• Do not hold the unit by the horizontal flaps when lifting it. (This may damage the horizontal flaps.)
(1) Open the piping through-hole.
• The refrigerant pipe and drain pipe can be passed out in one of 6 directions: left, bottom-left, back-left,
right, bottom-right, and back-right. (Refer to Fig. 3)
• Using the paper pattern for installation (3), choose where to pass the piping out and open a through-
hole (φ80) in the wall. Open the hole so that there is a downward slope for the drain piping.
(See "6.DRAIN PIPING WORK")
5
50
Fig. 1
Obstruction
≥ 2500 (from floor)
For installation
in high places.
Floor
≤ 120
Fig. 2
English

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fayp71lv1Faq71buv1b

Table of Contents