Viessmann Vitodens 100-W WB1B Installation And Service Instructions Manual page 12

Table of Contents

Advertisement

Installation sequence
Installing the boiler and making all connections
Condensate connection
Filling the siphon with water
12
(cont.)
Connect condensate drain A with a
slope and a pipe vent to the public
sewer.
Observe the local waste water regula-
tions.
Note
Fill the siphon with water before start-
up.
Fill a minimum of 0.3 l of water into the
flue gas connection.
!
Please note
At commissioning, flue gas may
be emitted from the condensate
drain.
Fill the siphon with water before
start-up.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents