Venini VEF61.1GG Installation Instructions User Instructions page 6

Table of Contents

Advertisement

Height over hob:
Height over upstand:
Width:
Depth: (incl. oven door
Depth: (flush with oven door):
connection
Electrical
The electric lead and plug are for connection to a 10 Amp socket. A 10 Amp
socket is to be within 1 m of the appliance.The lead is situated at the left hand side
of the cooker.
Gas regulator
The gas connection is via 1/2" compression. Connect the cooker to the gas supply
and check for gas soundness.
If using a flexible connection
This appliance is approved for connection with a Flexible Hose, which complies with
AS/NZS 1869 (AGA Approved), 10mm ID, class B or D, between 1 - 1.2m long .
Connection shall be in compliance with AS 5601, clause 5.12.1.8.
When installing the hose restraint device, the appliance anchor point is the rear panel
securing.
If using copper connection
&
handle
knobs):
Gas and electric connection
910 mm
980 mm
595mm
650mm
600mm

Advertisement

Table of Contents
loading

Table of Contents