Levelling The Machine; Installation On A Raised Plinth; Payment System; Communication Module Xkm Rs232 - Miele PT 8257 WP Operating Instructions Manual

Table of Contents

Advertisement

Levelling the machine

The dryer and heat pump unit do not require a plinth.
However, make sure that any uneven areas of the
floor are made level.
The dryer and heat pump unit must be perfectly level
to ensure correct functioning.
The screw feet A can be adjusted to align the dryer
and the heat pump unit.
After aligning correctly you will need to use a
screwdriver to secure discs B to the floor plate.
Allow the unit to acclimatise to the room
temperature and leave to stand for at least one
hour before commissioning.

Installation on a raised plinth

The dryer and heat pump unit can be installed on a
raised concrete plinth.
,
If the dryer and heat pump unit are installed on
an on-site plinth, they must be secured with
clamps. Otherwise there is the danger of them
falling off the plinth.
^ Secure the front feet of the dryer with the clamps
supplied.
Installation and connection
b Drill holes for clamps

Payment system

This dryer can be fitted with a coin control unit.*
A suitable adapter* is required for this. The dryer has
to be reprogrammed for a payment system. This has
to be carried out by an authorised Miele service
technician.
Empty the coin box every day. This prevents too
many coins or tokens collecting in the coin box,
which could lead to the dryer being out of service.
* These can be obtained from Miele or your Miele
Dealer.

Communication module XKM RS232

This dryer can fitted with a communication module
which enables it to be linked to a PC via a serial
interface.
The slot for the communication module is located on
the rear of the dryer.
An editor programme is available from Miele.
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt 8337 wp

Table of Contents