Installation And Connection - Miele PT 8257 WP Operating Instructions Manual

Table of Contents

Advertisement

This dryer must only be installed and
commissioned by a Miele authorised technician.
This dryer must be installed in strict accordance with
local and national safety and building regulations by
a suitably qualified engineer. It must only be operated
in a room with sufficient ventilation.
Read the instructions supplied before installing and
using it for the first time.
Do not install the tumble dryer in a room where there
is a risk of frost occurring.
,
The dryer and the heat pump unit must not be
transported without the transport pallet in place.
The dryer module and the heat pump module must
be separated before transportation, even it they are
only to be transported a short distance. Transporting
the dryer and heat pump unit when connected to one
another is not permitted and will cause damage.
The dryer and heat pump unit may only be
transported using suitable transport aids.
It is particularly important to avoid tipping the heat
pump unit by more than 30°.
Leave the heat pump unit to stand for one hour in its
final location before commissioning it. If the heat
pump unit has been subjected to a great deal of
vibration or it has been tipped by more than 30°, the
standing time can be extended to up to 24 hours.
After transporting the dryer and heat pump unit to
their final location, use a suitable lifting mechanism to
lift them off the transport pallet.

Installation and connection

To ensure suitable access for future maintenance and
service work, please ensure that the minimum
distances between the dryer/heat pump unit and the
wall specified on the installation diagram are strictly
observed.
Minimum distance to wall for maintenance and
service work: 500 mm
PT 8257 / 8337
x
y
z
1205 / 1393 mm
1400 mm
906 mm
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt 8337 wp

Table of Contents