Dunkirk 95M-200 Control Manual And Troubleshooting Manual page 18

Hide thumbs Also See for 95M-200:
Table of Contents

Advertisement

Blower turning when it should be
29
off.
High limit operation:
30
Temperature rise across boiler too
high.
61
Pressure switch contacts closed.
Blower not operating when turned
65
on.
9 - TROUBLESHOOTING
Check boiler wiring against wiring diagram.
1
Replace line voltage and low voltage wiring harnesses if necessary.
Replace control module if wire replacement doesn't resolve.
Flow rate too low.
Check system for:
Verify boiler and system are full of water.
1
Inspect and verify system piping and components.
Verify piping agrees with boiler manual recommendations.
Make sure system pressure drop is not too high.
Verify operation of boiler circulator.
Check voltage at circulator junction box to ensure 120 vac when boiler operates. If
no voltage, check wiring and wiring connections.
High voltage terminal strip terminals 5 and 6 should show 120 vac for space
2
heating; terminals 3 and 4 should show 120 vac for DHW.
Replace circulator if powered but not operating.
Replace line voltage wire harness if necessary.
Replace control module if wire replacement doesn't resolve.
Check pressure switches for proper operation.
1
Replace pressure switch if moisture has entered switch.
Turn off power to boiler. Remove line voltage connector at blower. Restart boiler
and check voltage across blower plug terminals. If 120 vac is NOT present, inspect
1
wiring and tightness of connections.
Replace line voltage wire harness if necessary.
Replace control module if wire harness replacement doesn't resolve.
If 120 vac is present on blower wire harness, replace harness and retry. If problem
2
persists, replace blower motor.
18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents