Download Print this page

Hunter XCITE Quick Start Manual page 5

Advertisement

3
1. Tie vang to vang fiddle block.
2. Run through upper sheave, from top on vang jam
block.
3. Run back up through vang fiddle block from bot-
tom.
4. Run through lower sheave, from top and pull up to
jam.
1
1. Attach Bridle to eye straps on side of cockpit.
2. Attach Mainsheet shackle to bridle.
3. Run through mainsheet blocks on mast.
4. Run down through mainsheet ratchet block.
Rigging the Vang and Mainsheet
1
2
4
3
2
Completed Vang
Assembly
4
PAGE
5

Advertisement

loading