Installing / Removing Transport Fittings; Mains Connection - KERN EWJ Operating Instructions Manual

Precision balances
Table of Contents

Advertisement

6.2.2 Installing / removing transport fittings

The right place is decisive for the accuracy of the weighing results of high-resolution
precision balances (see chap. 6.1).
 Removing transport locking devices
 Install weighing plate and wind shield if necessary.
 Level balance with foot screws until the air bubble of the water balance is in the
prescribed circle.
 Check levelling regularly

6.3 Mains connection

Power is supplied via the external mains adapter. The stated voltage value must be
the same as the local voltage.
Only use KERN original mains adapter. Using other makes requires consent by
KERN.
EWJ-BA-e-1411
13

Advertisement

Table of Contents
loading

Table of Contents