CONDENSING WALL-HUNG COMBINATION BOILER Central Heating and Instantaneous Domestic Hot Water - Fanned Flue system Installation and Operating Instructions Centora green 18-24 G.C.N: 47-980-21 PLEASE LEAVE THESE INSTRUCTIONS WITH THE END-USER...
These instructions are suitable for ‘CENTORA GREEN’ boilers : Do not forget the Log Book! Chaffoteaux & Maury supports Benchmark, the heating industry code to ensure the correct installation, commissioning and servicing of domestic central heating systems. To The End User Make sure you have a completed Log Book for your boiler.
USER INSTRUCTIONS Page 12- CONTROL PANEL ............................18 13- HOW TO USE ..............................19 Switching On ............................19 Switching On the Central Heating ......................19 Switching On the Domestic Hot Water ....................19 Switching On the Domestic Hot Water and Central Heating Together ..........19 Stand-by Mode .............................20 Turn Off the Boiler ..........................20 14 MAINTENANCE ............................20 15 GUARANTEE ..............................20...
Dimensions Outer case dimensions : fl 105 - Width : 440 (minimum space required 450) - Height : - Depth : Type C 13 ou C 42 Type C12, C42 or C22 43 kg With packaging 500 min for servicing Safety valve 54 54 54 54 center line...
Installation Requirements fused double-pole isolating switch with a contact separation Location of at least 3 mm on both poles. Alternatively, a fused 3 Amp. The boiler can be installed on any suitable internal wall. 3 pin plug and unswitched socket may be used, provided it is Provision must be made to allow the correct routing of the flue not used in a room containing a bath or shower.
Installing the Boiler Please check that you are familiar with the installation requirements before commencing work.(section 4) The installation accessories described in the following list are included in the boiler packaging. - Hanging bracket - A paper template (showing the dimensions of the boiler with 5 mm side clearances, fitting instructions and commissioning instructions) - Connection tails - Screws and wall plugs...
Electrical Connections Making the Electrical Connections Lower the electrical box to gain access to the electrical connections. Push in the tabs P (Fig. 13) on either side of the boiler and pivot the box forward. Undo the two retaining screws V , remove the cover and remove the cable clamp. C (Fig. 14) Connect the live and neutral wires to the multipin plug J1 (Fig.
Commissioning and Testing (continued) By-pass and Pump The boiler is fitted with a pre-adjusted by-pass. Although adjustment is not normally necessary, the by-pass can be reset by turning screw D (Fig. 15 ) anticlockwise to open the by-pass using the chart below for guidance. If used on a system with thermostatic radiator valves, the flow rate with the thermostatic valves closed should be adjusted to at least 300 l/hr.
Adjustments and Settings The boiler is delivered with pre-set values described in menus 3 and 4. All settings can be changed by the installer or a qualified person. To gain access to the setting keys please, open the front door P. (Fig. 18) DISPLAY Menu key Setting key...
Page 13
ACTION CONFIGURATION DISPLAY Menu - 1 - Default register 5 ” Records the last 10 defaults Section Digit 1 Digit 2 and 3 Last default occured code from 01 to 99 • Last but one default occurred code from 01 to 99 •...
Page 14
DISPLAY ACTION CONFIGURATION Menu - 3 - Boiler options once Section Digit Digit 2 and 3 Under floor heating system 0 : no 1 : yes x times ACTION CONFIGURATION DISPLAY Menu - 4 - Boiler settings Section Digit Digit once 2 and 3 Room thermostat operation...
Page 15
ACTION CONFIGURATION DISPLAY Menu - 5 - Combustion rate control mode press once Effect Display Combustion rate control mode OFF wait 5 ” Switching on the combustion rate Central heating temperature is control mode. Central heating displayed in output reaches the maximum power The 3 dots indicate that the set in menu 4 section 9.
Page 16
Adjustments and Settings (continued) C.H. power output setting : If you would like to change the setting of C.H. power output to 12 kW, please proceed as follows : (Note: the factory setting is 18 kW and the following explanation refers to menu 4 section 9) Display - Switch to installer mode, press the 5 ”...
Incorrect Operation In case of a problem, or when the boiler displays a message, the 2 digits will flash.. Please refer to the table below to diagnose the default. For default 01 and 03, the red indicator 35 will light (Fig.19) Overheat lock-out FAULT Fig.
USER INSTRUCTIONS Control Panel Fig. 20 26 25 Control panel (Fig. 20) 30.- Green indicator: Central Heating mode ON and RESET 16.- Pressure gauge (Reset button) 24.- Display 31.- Key to reduce the Central Heating temperature 25.- Switch for Domestic Hot Water mode 32.- Key to increase the Central Heating temperature 26.- Green indicator Heating Domestic Hot Water mode ON 33.-...
How to Use Switching on 1. Check that the pressure in the central heating system is above 0.7 bar and below 1.5 bar with the pressure gauge 16 (Fig.20) 2. Check that the gas service tap is opened at the gas meter and the main power is on. Green indicator (Power ON ) 33 (Fig.20).
How to Use ( continued Stand by mode A fixed digit at the centre of the display and the green indicator 33 (Fig.20) will light. Putting the boiler in stand-by mode and anti-freeze system. : Press the keys, 25 and 29 (Fig.20) to switch off both the D.H.W. and the C.H. mode. The green indicators 30 and 26 (Fig.20) will go out.
Gas Conversion This appliance is suitable for Natural gas or L.P.G. Any gas conversion must be made by a competent person. Incorrect Operation Fault Cause Solution The boiler doesn’t start Control gas, water and electrical No gas, no water or no electricity supply, fuses…...
Technical Data Model Centora green 18-24 Appliance category........... II 2H3P Gross heat input C.H. max......20.9 kW 71,290 Btu/h Gross heat input D.H.W. max ......27.8 kW 94,800 Btu/h Heat output C.H. 50°/30° max......19.5 kW 66,550 Btu/h Heat output C.H. 80°/60° max......
Page 24
Chaffoteaux & Maury are continuously improving their products and therefore reserve the right to change specifications without prior notice and accepts no liability for any errors or omission in the information contained in this document. Manufacturer: Chaffoteaux & Maury - France Commercial subsidiary: MTS (GB) Limited MTS Building Hughenden Avenue...
MAINTENANCE AND SERVICE GUIDE Fanned Flue Condensing Wall Hung Combination Boiler Central Heating and Instantaneous Domestic Hot Water Dimensions Outer case dimensions : - Width : 440 (minimum space required 450) - Height : - Depth : Safety valve Safety valve outlet 54 54 54 54 centre line Heating flow...
Page 26
Pump and Expansion Vessel Characteristics Pump head available Pression à froid pour le circuit chauffage (en bar) Central heating initial pressure when cold (in bar) Hauteur manométrique Minimum flow rate (with all heating thermostatic valves closed) Débit mini (robinets thermostatiques fermés) 40°C 50°C 60°C...
Page 27
FUNCTIONING Control Panel 24.- Display 25.- Domestic Hot Water switch 26.- Green indicator – Domestic Hot Water mode ON 27.- D.H.W. temperature reducing key 28.- D.H.W. temperature increasing key D.H.W. mode indica- 29.- Central Heating switch 30.- Green indicator – Central Heating mode ON 31.- Central Heating temperature reducing key 32.- Central Heating temperature increasing key 33.- Green indicator –...
Page 28
Switching On the Domestic Hot Water and Central Heating Together Press the key 29, the green indicator 30 will light. Press the key 25, the green indicator 26 will light. If there is no water demand the display will show the heating flow temperature During draw off a square made of 4 digits will move clockwise on the display Stand-by Mode...
Lockout Procedure error code. The pump runs and the 3 the safety solenoids close and the fan Flame extinguishes: way valve 17 stays in its position. After a stops. The orange bulb 34 will go off and When the ionisation probe 8 fails to few seconds, it will become possible to the pump will run for a further 3 minutes.
Page 30
ACTION CONFIGURATION DISPLAY Menu - 1 - Default Register 5 ” Records the last 10 defaults Section Digit 1 Digits 2 and 3 Last default occured code from 01 to 99 • Last but one default occurred code from 01 to 99 •...
Page 31
ACTION CONFIGURATION DISPLAY Menu - 3 - Boiler Options once Section Digit 1 Digits 2 and 3 Under floor heating system 0 : no 1 : yes x times ACTION CONFIGURATION DISPLAY Menu - 4 - Boiler Settings Section Digit 1 Digits 2 and 3 once Room thermostat operation 0 : Burner only...
Page 32
ACTION CONFIGURATION DISPLAY Menu - 5 - Combustion Rate Control Mode press once Effect Display Combustion rate control mode OFF wait 5 ” Switching on the combustion rate Central Heating temperature is dis- control mode. Central Heating out- played in put reaches the maximum power The 3 dots indicate that the combus- set in menu 4 section 9.
Page 33
C.H. Power Output Setting : If you would like to change the setting of the C.H. power output to 12 kW, please proceed as follows : Note: the factory setting is 18 kW and the following explanation refers to menu 4 section 9) Display - Switch to installer mode, press both 5 ”...
REGULATION FLOW SWITCHES Flow in both D.H.W. and Central Temperature regulation for both C.H. and D.H.W. circuits are controlled by 2 Heating circuits are detected by 2 flow thermistors. The C.H. knob allows the temperature to be adjusted between switches. A piston with a magnet at the C and 85°C.
REMOVAL AND REPLACEMENT OF PARTS Before removing the appliances case, 5. Ignition Electrode 11. Drain Down isolate the gas and electrical supplies. Carry out steps 1 and 2 as above. 2 drain points are located on the boiler. Isolate the boiler from the system and Disconnect the ignition electrode from its Air Separator drain before removing any component in...
Page 36
16. Main Heat Exchanger 19. Thermistors 23. Display P.C.B. Carry out steps 1 and 2 as above. Drain Drain the boiler as step 12. Disconnect Carry out step 1 as above and pivot the down the boiler as in step 12. Unscrew the plug, remove the retaining clip pull electrical box downwards by pressing three screws securing the air/gas con-...
Page 39
SHORT LIST Manf. date Key N° Description G.C N° Manf. Pt. N° Type from 1309624 ELECTRODE KIT 1308957 GAS VALVE 1307585 FAN ASSY 1010000 3-WAY VALVE 1010572 OVERHEAT THERMOSTAT 100°C 1000733 THERMISTOR 1011164 WATER/WATER HEAT EXCHANGER 81471 WATER THROTTLE 1002653 AIR SEPARATOR HEAD ASSEMBLY 1010612 PUMP UP 15/50 230V...
Page 40
Chaffoteaux & Maury are continuously improving their products and therefore reserve the right to change specifications without prior notice and accepts no liability for any errors or omission in the information contained in this document. Manufacturer: Chaffoteaux & Maury - France Commercial subsidiary: MTS (GB) Limited MTS Building Hughenden Avenue...
Page 41
DOMESTIC BOILERS CENTORA GREEN CENTORA GREEN SYSTEM 24 CENTORA GREEN 24 CENTORA GREEN SYSTEM 30 CENTORA GREEN 30 Réf. 82025.98d - 07/03 - GB...
Page 42
100 BURNER 200 FAN 300 SEALED CASE 82071.85...
Page 43
Manf. date Key N° Description G.C N° Manf. Pt. N° Type from BURNER ASSEMBLY 1306074 BURNER 61309327 BURNER 1308492 DOOR ASSY 24KW 61308491 DOOR ASSY 30KW ..1309658 GASKET D:110-75-2 1306181 FIXING BRACKET 61309237 FIXING BRACKET 1306180 FIXING BRACKET 61309238 FIXING BRACKET ..
Page 45
Manf. date Key N° Description G.C N° Manf. Pt. N° Type from GAS SECTION 61312986 GAS SECTION ASSY 61312987 GAS SECTION ASSY 61307584 GAS SECTION ASSY 61310129 GAS SECTION ASSY 1307649 11/02 VENTURI D:20 61310128 11/02 VENTURI D:22 ..61310333 SCREW CLXS M 4-30 ..
Page 53
Manf. date Key N° Description G.C N° Manf. Pt. N° Type from JIG PLATE & PIPE FITTING 1312381 PREFABRICATION E00627 1012448 PREFABRICATION ..1020388 WATER FLOW SERVICE TAP 1020916 HOT WATER CONNECTION ..1020389 GAS SERVICE TAP 1302612 COLD WATER TAP ..