Remove The Security Bezel (Optional); Power Down The Server - HP ProLiant DL120 Gen9 Maintenance And Service Manual

Hide thumbs Also See for ProLiant DL120 Gen9:
Table of Contents

Advertisement

Remove the security bezel (optional)

The security bezel is only supported in servers using the quick-release latch rack ears.
To access the front panel components, unlock and then remove the security bezel.

Power down the server

Before powering down the server for any upgrade or maintenance procedures, perform a backup of critical
server data and programs.
WARNING:
remove the power cord to remove power from the server. The front panel Power On/Standby
button does not completely shut off system power. Portions of the power supply and some internal
circuitry remain active until AC/DC power is removed.
IMPORTANT:
system.
To power down the server, use one of the following methods:
Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the server enters standby
mode.
Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter
standby mode.
This method forces the server to enter standby mode without properly exiting applications and the OS.
If an application stops responding, you can use this method to force a shutdown.
Use a virtual power button selection through Dedicated iLO management.
This method initiates a controlled remote shutdown of applications and the OS before the server enters
standby mode.
Before proceeding, verify the server is in standby mode by observing that the system power LED is amber.
To reduce the risk of personal injury, electric shock, or damage to the equipment,
When the server is in standby mode, auxiliary power is still being provided to the
Removal and replacement procedures 29

Advertisement

Table of Contents
loading

Table of Contents