Dunkirk EXCELSIOR EXB4075 Installation, Operation & Maintenance Manual page 55

High efficiency oil fired hot water boiler
Hide thumbs Also See for EXCELSIOR EXB4075:
Table of Contents

Advertisement

!
DANGER
Before servicing, turn off electrical power to boiler
at service switch. Turn off fuel supply to burner.
Failure to comply will result in death or serious
injury.
!
WARNING
Fire, burn, asphyxiation hazard. Turn off service
switch to boiler to prevent accidental firing of
burner outside combustion chamber. Disconnect
burner power cord from wire harness in front jacket.
Tighten swing door fastener completely when
service is complete. Failure to follow instructions in
this manual and understand all requirements could
result in death or serious injury.
19.1 Oil Boiler Cleaning Instructions
1.
Clean flueways. Figure 46, Page 56.
A. Shut off power to burner.
B. Access to combustion chamber, remove swing door
bolts. If boiler is equipped with flexible fuel line(s),
swing door open.
C. Remove vent connector.
D. Remove liners & baffles (if equipped) from flue
passages. Baffles are installed in 3rd pass (two inner
flue ways.)
E. Clean 3rd Pass – Insert 2" Dia. x 42" long wire or fiber
bristle brush into each of two 3rd passes. Using long
strokes, push brush all the way through boiler until
brush has exited the smoke box opening.
Pull brush all the way forward until it has exited front
of boiler.
Continue this operation for entire height of flue way
until clean. Repeat operation for other 3rd pass flue
way.
F. Clean 2nd Pass – Insert wire or fiber bristle brush into
each of two 2nd passes. Using long strokes, push
brush all the way through boiler until brush hits back
wall of reversing chamber. Pull brush all the way
forward until it has exited front of boiler.
Continue operation for entire height of flue way until
clean. Repeat operation for other 2nd pass flue way.
G. Do not start burner unless burner swing door and vent
connector are secured in place.
H. Clean passage from combustion chamber to 2nd pass.
I.
Vacuum loose debris in bottom of combustion chamber
and smoke box.
19 - OIL BOILER / BURNER CLEANING INSTRUCTIONS
2.
Clean combustion chamber and baffles. Use wire
or fiber bristle brush to clean surfaces of combustion
chamber and baffles. Vacuum all of loose debris in
bottom of combustion chamber.
3.
After cleaning: Vacuum all remaining debris as
necessary. Inspect burner swing door insulation, and
rope gasket for signs of damage. If damaged, replace
as needed.
4.
Re-assemble boiler.
A. Insert liner and baffles (if equipped) into correct flue
way. Baffles are installed in 3rd pass. (Two inner flue
ways)
B. Inspect chimney and clean if necessary.
C. Clean and re-attach vent connector onto rear of the
boiler with three screws.
When securing burner swing door verify door is
drawn-in equally on both sides. Do not overtighten
door bolts. Rope gasket will provide sufficient seal
when door is snugged into place.
D. Tighten swing door hardware to provide adequate
seal to rope gasket around perimeter of door. Use
alternating tightening method from non-hinged side to
hinged side cap screws to pull door tight equally.
!
WARNING
Asphyxiation hazard. A clean and unobstructed
chimney flue is necessary to allow noxious fumes
that could cause injury or loss of life to vent safely.
Inspect periodically throughout heating season for
any obstructions. Failure to follow instructions in
this manual and understand all requirements could
result in death or serious injury.
Connect boiler to approved chimney in good
condition. Property damage could result if boiler is
connected to dirty or inadequate chimney. Inspect
interior of chimney flue and clean before start of
heating season.
19.2 Oil Burner Cleaning Instructions
Consult burner manufacturer's instructions.
55
NOTICE
NOTICE

Advertisement

Table of Contents
loading

Table of Contents