Install Attic Insulation Shield - Vermont Castings SB100 Installation Manual

Woodburning fireplace installation and fireplace setup
Hide thumbs Also See for SB100:
Table of Contents

Advertisement

F. Install Attic Insulation Shield
WARNING! Risk of Fire! You MUST install an attic insu-
lation shield when there is any possibility of insulation or
other combustible material coming into contact with the
chimney.
• DO NOT pack insulation between the chimney and the
attic insulation shield.
• Failure to keep insulation and other materials away from
chimney pipe could cause fire.
• DO NOT offset chimney inside insulation shield.
Installation of a ceiling firestop is required:
Refer to Figures 5.4, 5.6, 5.7.
Roll the shield (around the chimney if already installed).
The three holes on each side will match up (large holes
on top).
Insert three screws into the matching holes to form a
tube.
Bend the tabs on the bottom of the tube inward to 90° to
maintain chimney air space.
Rest the insulation shield on the ceiling firestop below.
Bend the tabs at the top of the shield inward to 90° to
maintain the 2 in. (51 mm) air space from the chimney.
If you wish to make a custom shield or barrier, follow
these guidelines:
Metal is preferred, although any material stiff enough to
hold back the insulation can be used.
WARNING! Risk of Fire! Use of cardboard or other
materials that can deflect under humidity or other envi-
ronmental conditions is not recommended.
The shield or barrier must be tall enough to extend
above the insulation and prevent blown-in insulation from
spilling into the cavity.
Maintain specified air spaces around chimney.
Check instructions and local codes for further details.
Double-check the Chimney Assembly
Continue assembling the chimney sections up through
the ceiling firestops as needed. While doing so, be
aware of the height and unsupported chimney length
limitations given under Section 4.
Check each section by pulling up slightly from the top
to ensure proper engagement before installing the suc-
ceeding sections. If they have been connected correct-
ly, they will not disengage when tested.
VCG Biltmore Series • SB100 • 4013-303 Installers Manual • Rev A • 02/19/15
Insert three
screws
Figure 5.5
Prepare Attic Insulation Shield
2 in. (51 mm)
air space
bent in 90°
and taped
Insulation
13 in.
(330 mm)
Figure 5.6
Install Attic Insulation Shield (firestop above ceiling)
2 in. (51 mm)
air space
bent in 90°
and taped
Insulation
13 in.
(330 mm)
Figure 5.7
Install Attic Insulation Shield (firestop below ceiling)
Tabs bent 90°
Tabs bent 90° to
rest against pipe
Pipe
Attic Insulation Shield
17 in. (432 mm)
Tabs
diameter
Ceiling Firestop
Pipe
Insulation
Tabs bent 90° to
rest against pipe
Pipe
Attic Insulation Shield
17 in. (432 mm)
diameter
Tabs
Insulation
Ceiling Firestop
Pipe
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sb100hb

Table of Contents