DURKOPP ADLER 969 ECO Operating Manual page 25

Table of Contents

Advertisement

Operation
Operating manual 969 - 00.0 - 08/2014
Fig. 6: Threading thread in reel holder
(1) - Thread guide
(2) - Hole in the pre-tensioner
(3) - Hole in the tube
1. Slide reel on bobbin (5)
2. Release the nut (4).
3. Important: Adjust the height of the tube (6) according to the
illustration, so that it projects 10 to 15 mm above the thread
bobbin.
4. Turn the tube so that the opening in the tube (3) faces the
thread guide (1).
5. Tighten the nut (4).
6. Feed the thread into the pipe (6), through the opening (3),
through the thread guide (1) and into the opening on the pre-
tensioner (2).
(4) - Nut
(5) - Bobbin
(6) - Tube
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

969 classic

Table of Contents