Wolf COB Installation Instructions And Technical Manual page 41

Boiler for heating boiler with stratification cylinder oil condensing boiler
Table of Contents

Advertisement

CO
adjustment by
2
matching the pipe
lengths
Adjusting the CO
value in the
2
upper load range (stage 2)
(emissions test mode)
CO
set value, boiler closed stage 2
2
13.5 ± 0.3%
CO
check in the lower load
2
(stage 1)
CO
set value, boiler closed stage 1
2
13.5 ± 0.3%
Completing the adjustments
3062547_201507
27. CO
check/adjustment by matching
2
the pipe lengths
With contractor parameter HG 00 (see chapter 19 "Contractor level parameters"),
the appliances can be matched to the flue gas system by changing the speed
for both stages.
- The casing must be closed for this setting.
- Remove the cap from the l.h. "flue gas" test port.
- Insert the test probe of the CO
(approx. 70 mm).
- Turn the program selector switch on BM module to "Emissions test". (Illuminated
signal ring as status indicator
- Measure the CO
content and compare it against the values given in the Stage 2
2
table adjacent.
- If required, alter the CO
content with parameter HG00.
2
HG 00
CO
settings
2
Factory setting: 3
1
2
5
Higher CO
value
2
- Measure the flue gas, CO
them in the commissioning report (chapter 29).
- Modifying the parameter HG00 has also adjusted the speed for stage 1. For checking
purposes, the boiler must be set to stage 1.
- Switch HG28 burner operating mode from 2 (two-stage) to 1 (single stage).
- Measure the CO
table adjacent.
- If the value is outside the set value, the CO
pressure (see chapter 28 "Commissioning without Wolf control accessories").
- Reset HG28 burner operating mode from 1 to 2.
- Terminate the emissions test mode by turning the program selector switch on the
BM programming module to the required operating mode. If emissions test mode
is not reset manually, the appliance switches back to the original operating mode
automatically after 15 minutes.
- Remove the test probe and close the test port.
- Check the control parameters and match them to the system if necessary.
- Check the condensate drain.
- Instruct the customer in the operation of the boiler, with the aid of the operating
instructions.
- Complete the commissioning report (chapter 29) and hand over the instructions to
the customer.
- Instruct the customer about the need for annual servicing.
- Instruct the customer about energy saving options.
- Refer your customer to section "Information regarding energy efficient operation" in
the operating instructions.
measuring instrument into the "flue gas" test port
2
flashes yellow.)
3
4
Lower CO
value
2
content, flue gas temperature and soot value and enter
2
content and compare it against the values given in the stage 1
2
value must be adjusted via the pump
2
41