Flue Gas Damper Installation / Wiring Diagram - Wolf COB Installation Instructions And Technical Manual

Boiler for heating boiler with stratification cylinder oil condensing boiler
Table of Contents

Advertisement

Flue gas damper wiring diagram
COB terminal box
Netz
L1
L1
N
Power supply (230 VAC; 200 VA)
38
25. Cascade operation

Flue gas damper installation / wiring diagram

KKP
LP
E1
eBUS
N
L1
N
L1
a b
+ -
L1
L1
1 2
N
N
1 2
Flue gas damper with
servomotor
COB-15/20/29/40
Junction box
on site
Programmable output A1
(230VAC; 200VA)
Note:
Contractor parameter HG13
AF
SF
(input E1) must be set to 5 and
1
2
1
2
HG14 (output A1) must be set
to 7.
1 2
1 2
M
230 V ~
Limit switch
NB:
Flue gas damper limit switch
must be zero volt. Otherwise
the COB control unit will be
destroyed.