Termination (Rxgy-G02) - Rheem R95P Installation Instructions Manual

(-)95p series
Table of Contents

Advertisement

GENERAL VENTING REQUIREMENTS AND
GUIDELINES
DIRECT VENT (cont.)
OPTION 8: SIDE WALL VENT KIT (RXGY-G02)
INSTALLATION – RXGY-G02 SIDE WALL VENT KIT
This termination is for horizontal venting only. This termi-
nation may be installed with either a non-direct-vent or a
direct-vent system. When installed as non-direct vent, only
one wall penetration is necessary for the exhaust vent.
IMPORTANT: Do not install on the prevailing winter wind
side of the structure.
IMPORTANT: Maintain a minimum of 12 inches (U.S.) or
18 inches (Canada) above grade or the highest anticipated
average snow level (whichever is greater) to the bottom of
the vent cover.
NOTE: Dimensions between the inlet and outlet pipes (di-
rect-vent only) are fixed by the sidewall termination. Other
drawings in this manual which specify minimum and/or
maximum distances (vertical and horizontal) between
pipes do not apply to the sidewall termination kit.
NOTE: Multiventing – NO COMMON VENTING IS PER-
MITTED WITH THIS KIT.
NOTE: With this option a trap on the inlet combustion
air pipe is NOT required.
NOTE: Install the vent and air intake piping into the vent
plate openings. Seal all gaps between the pipes and wall.
FIGURE 30
VENT KIT INSTALLATION OPTIONS
ST-A1194-46
64
8"
MIN.
8"
MIN.
BE SURE TO USE SILICONE SEALANT to seal the vent
pipe to the vent cap to permit field disassembly for annual
inspection and cleaning. Also seal all pipe penetrations in
the wall. DO NOT INSTALL VENT KITS ONE ABOVE
THE OTHER to prevent the possibility of condensate
freeze-up or recirculation.
NOTE: Vent should protrude a maximum of 2-1/4 inches
beyond the vent plate. Air intake should protrude a maxi-
mum of 1 inch beyond the vent plate.
Use the vent plate as a template to locate the vent, com-
bustion air and four mounting holes. Observe the mini-
mum clearances. Cut two 2-5/8 inch diameter holes for
the vent and combustion air openings. For non-direct vent
installations only one hole (for the exhaust vent) is re-
quired. Drill four 3/16 inch diameter holes for inserting the
plastic anchors into the wall. Attach the vent plate to the
wall with four screws provided (#8, 2 inches long, SMS
Type A18-8 Stainless Steel).
Assemble the vent cap to the vent plate. Insert the four 2
inch long stainless steel screws into the vent hole open-
ings and securely attach the vent cap to the vent plate.
Seal all wall cavities.
FIGURE 31
TYPICAL INSTALLATION – DIRECT-VENT
MINIMUM CLEARANCE ABOVE THE HIGHEST
ANTICIPATED SNOW LEVEL OR GRADE WHICHEVER
IS GREATER. IN CANADA TERMINATIONS MUST CONFORM
ST-A1194-46
MAINTAIN 12"/31cm FOR THE U.S. AS THE
TO CSA B149.1-10, SECT. 8.14.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents