Rheem R95P Installation Instructions Manual page 56

(-)95p series
Table of Contents

Advertisement

GENERAL VENTING REQUIREMENTS AND
GUIDELINES
NON-DIRECT VENT (cont.)
OPTION 3: ALTERNATE HORIZONTAL TERMINATION
Figure 19 shows the alternate non-direct vent horizontal termination with minimum clearances.
FIGURE 19
ALTERNATE HORIZONTAL NON-DIRECT VENT TERMINAL
8" to 12"
FROM
WALL
60" Max.
12"/31cfm ABOVE GRADE
OR AVG. ANTICIPATED
SNOW LEVEL. FOR
CANADIAN INSTALLATIONS,
TERMINATIONS MUST
CONFORM TO CSA
B149.1-10, SECT. 8.14.
OPTION 4: RXGY-G02 SIDE WALL
VENT TERMINATION
See Figure 20 and refer to the DIRECT VENT
Section, OPTION 8: SIDEWALL VENT KIT of
this manual for information and directions on
the side wall vent kit. The sidewall vent kit
(RXGY-G02) can be used for both direct-vent
and non-direct vent installations.
56
ST-A1194-19
FIGURE 20
FIG F
TYPICAL INSTALLATION – NON-DIRECT VENTING
ST-A1194-53
MAINTAIN 12"/31cfm FOR THE U.S. AS THE
MINIMUM CLEARANCE ABOVE THE HIGHEST
ANTICIPATED SNOW LEVEL OR GRADE WHICHEVER
IS GREATER. IN CANADA TERMINATIONS MUST CONFORM
TO CSA B149.1-10, SECT. 8.14.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents