Rheem R95P Installation Instructions Manual page 16

(-)95p series
Table of Contents

Advertisement

Checklist:
__ VERIFY ALL HOSES ARE SECURE AND FULLY SEATED.
__ CONFIRM THAT ALL HOSES ARE FREE OF KINKS
__ CONFIRM ALL HOSES AND OTHER DRAIN PARTS HAVE A
SLOPE IN DIRECTION OF WATER FLOW
__ ALL CLAMPS AND COUPLINGS ARE TIGHTENED
__ ALL DRAIN PORTS ARE PLUGGED
__ UNIT HAS FORWARD PITCH
__ HEAT TAPE INSTALLED(IF REQUIRED)
Notes:
16
ST-A1194-28-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents