Arrow Storage Products 697.68222 Owner's Manual & Assembly Instructions page 9

Arrow storage products outdoor storage - lawn storage building user manual
Hide thumbs Also See for 697.68222:
Table of Contents

Advertisement

Foundation
AQ09
OPTION
1: ARROW
FLOOR
FRAME
KIT:
No. F B1014-A
o r 68387-A)
Arrow has the best base for your building in this simple kit. It keeps stored items above the ground.
This kit should be used with one of the following:
A. To support a plywood deck B. To be filled with sand. We recommend the combined use of
1. an ARROW FLOOR FRAME KIT and 2. an ARROW ANCHORING KIT as an effective method of securing the building to the ground.
Allow I - 2 hours for construction.
OPTION
2: Wood
Platform
If you decide to build your own foundation,
be sure to select the appropriate
materials.
These are the recommended
materials
for your foundation:
® 2 x 4's (5cm x 10cm) Pressure Treated Lumber • 5/8" (1,5cm) 4 x 8 (122cm x 244cm) Plywood-exterior grade
• 10 & 4 penny Galvanized Nails • Concrete Blocks (optional)
The platform should be level and flat (free of bumps, ridges etc.)
to provide good support for the building. The necessary materials
may be obtained from your local lumber yard.
To construct
the foundation
follow instructions and diagram.
Construct frame (using 10 penny galvanized nails)
Measure 16"/24" (40,6cm/61cm) sections to construct
inside frame (see diagram)
Secure plywood to frame (using 4 penny galvanized nails)
Allow 6 - 7 hours for construction.
OPTION
3: Concrete
Slab
FRONT
(DOOR)
Note: Platform/Slab
will extend 9/16" (1,4cm) beyond floor
frame on all four sides. Seal this 9/16" of wood with a
roofing cement (not included), or bevel this 9/16" of
concrete
when pouring,
for good water drainage.
The slab should
be at least 3" to 4" (8-10cm) thick, it must be level and flat to provide good support
for the frame.
The following
are the recommended
materials
for your foundation.
• 1 x 4's (2,5cm x 10cm) (will be removed once the concrete cures)
® Concrete • Sheet of 6 mil plastic
• We recommend for a proper strength concrete to use a mix of:
1 part cement • 3 parts pea sized gravel • 2 1/2 parts clean sand
Prepare the SRe/Construct
a Foundation
1. Dig a square, 6" (15cm) deep into the ground (remove grass).
2. Fill up to 4" (10cm) in the square with gravel and tamp firm.
3. Cover gravel with a sheet of 6 mil plastic.
4. Construct a wood frame using four planks of 1x4 (2,5cm x 10cm)
lumber.
5. Pour in concrete to fill in the hole and the frame giving a
total of 4" (8-10cm) thick concrete. Be sure surface is level.
Note: Finished Slab dimensions, with lumber removed.
Allow 3 - 5 hours for construction
and a week for concrete
curing time.
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents