Download Print this page

Advertisement

Quick Links

Owner's Manual & Assembly Instructions
AI01
Model No.
722890817
Storage Area:
84 Sq. Ft.
7,8 m
BUILDING DIMENSIONS * Size rounded off to the nearest foot
*Approx.
Base
Size
Size
10' x 9'
121" x 105"
3,0 m x 2,6 m
307,3 cm x 266,7 cm
697.76092 A
Missing Parts, Questions on Assembly?
Call: 1-800-851-1085 or
assist@arrowsheds.com
Do not return to dealer, they are not
equipped to handle your requests.
553 Cu. Ft.
15,7 m
2
3
Exterior Dimensions
(Roof Edge to Roof Edge)
Width
Depth
123 1/4"
107 1/2"
313,1 cm
273,1 cm
WH109EU A
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
Interior Dimensions
(Wall to Wall)
Height
Width
87 7/8"
118 1/4"
223,2 cm
300,4 cm
WH109 A
Depth
Height
Width
102 1/4"
86 5/8"
55 1/2"
259,7 cm
220,0 cm
141,0 cm 152,4 cm
Door
Opening
Height
60"

Advertisement

loading

Summary of Contents for Arrow Storage Products WH109EU

  • Page 1 Owner's Manual & Assembly Instructions AI01 Model No. 697.76092 A WH109 A WH109EU A Missing Parts, Questions on Assembly? Call: 1-800-851-1085 or assist@arrowsheds.com Do not return to dealer, they are not equipped to handle your requests. 722890817 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE Storage Area: 84 Sq.
  • Page 2 GB: Assembly manual in additional languages available online. Scan QR code below to access. FR: Manuel de montage disponible en ligne dans d’autres langues. Pour y accéder, scannez le code QR ci-dessous. SP: Manual de montaje en idiomas adicionales disponible online. Escanee el código QR a continuación para acceder.
  • Page 3 BEFORE YOU BEGIN..Owner's Manual Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable. Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model.
  • Page 4: Tools And Materials

    PLAN AHEAD..Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building.
  • Page 5 SAFETY FIRST..Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various •Practice caution with the tools being used in pieces of your building since some contain the assembly of this building. Be familiar with sharp edges.
  • Page 6 CARE & MAINTENANCE..Finish: For long lasting nish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation. Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom.
  • Page 7 ACCESSORIES..FLOOR FRAME KITS ROOF STRENGTHENING (heavy snow load) KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof. BEFORE AFTER ANCHOR KITS Model No. AK4 MODELS FB47410, FB5465, FB106-A Anchor Kit contains heavy-duty steel FB109-A and FB1014-A augers, 60' (18 m) of steel cable and...
  • Page 8: Special Note

    ORDERING ACCESSORIES..02/13 We recommend that you purchase accessory items from your local storage building dealer whenever possible; however, because the full line of accessories is not always available from all dealers, Arrow is o ering them to you on a direct basis. There are two ways to order Arrow Storage Building Accessories: Option 1 Option 2...
  • Page 9 Base The Base For Your Building No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an e ective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.).
  • Page 10 Anchoring Anchoring Down The Building It is important that the entire oor frame be anchored after the building is erected. Below are recommended ways of anchoring. Anchoring into Wood/Post: Arrow Anchoring Kit: (Model No. AK4 or 60298) Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm) Recommended for use with any suggested base.
  • Page 11 Hardware AI11 Remove from bag of screws and save for the last step 65900A #10Bx1/2" (13 mm) 65923 65004 65103 Black Screw (8) #8-32x3/8" (10 mm) #8Ax5/16" (8 mm) #8-32 Hex Nut (213) (Packed with Screws) Bolt (213) Screw (388) 66646 66769 67468...
  • Page 12: Parts List

    Parts List AI12 Part Description Assembly Key # Part Number Qty in Carton Checklist 5986 Rear Wall Angle 6085 Roof Beam Bracket 6114 Small Right Gable 6115 Small Left Gable 6227 Roof Beam Brace 6403 Door Track Splice 6636 Gable Brace 10497 Horizontal Door Brace 7858...
  • Page 13 Assembly by Key No. AI13...
  • Page 14 Step 1 8934 Ramp (1) Parts Needed For 9367 Front Floor Frame (2) Floor Frame Assemblies 8936 Rear Floor Frame (2) 8945 Side Floor Frame (4) The front oor frame is made up of three pieces. The side floor frames 9367 and the rear floor frame are made up of two pieces.
  • Page 15 5986 Rear Wall Angle (2) Step 2 8740 Side Wall Angle (4) Parts Needed For 9004 Right Side Wall Channel (2) Frame Assemblies 9005 Left Side Wall Channel (2) 9006 Right Rear Wall Channel (1) 9007 Left Rear Wall Channel (1) The main frame pieces reinforce the walls.
  • Page 16 Step 3 Parts Needed For 10517 Roof Beam (12) Roof Beam Assemblies The roof beams join the two gables 10517 and support the roof panels. The main roof beam is made up of four Roof Beam 104 1/8" 264,5 cm pieces overlapped back to back at the center.
  • Page 17 Step 4 Parts Needed For 6403 Door Track Splice (1) Door Track Assembly 9366 Door Track (2) NOTE: The door track assembly supports the Door Track Splice (painted part) sliding doors and reinforces the front wall. It is made up of three pieces. 6403 Using the door track splice, (painted), join the door track...
  • Page 18 Step 5 Front Floor Assembly (1) Parts Needed For Side Floor Assembly (2) Floor Frame Rear Floor Assembly (1) RIGHT REAR 8945 Assemble the four corners of the oor frame using two screws at STEP 8936 each corner as shown. At the front corners fasten bolts through from the bottom with nuts on top.
  • Page 19 8716 Right Corner Post (2) Step 6 Parts Needed For 8715 Left Corner Post (2) Door Track Assembly (1) Posts/Top Frames Side Wall Angle Assembly (2) Rear Wall Angle Assembly (1) NOTE The remainder of the building assembly requires many hours and more than one person.
  • Page 20 Step 7 Parts Needed For 8718 Rear Splice Post (1) 8734 Side Splice Post (2) Splice Post/Door Jamb 8717 Door Jamb (2) STEP The door jambs reinforce the door opening and provide an attractive ANGLED END OF SPLICE POST MUST trim.
  • Page 21 Side Wall Channel Assemblies (2) Step 8 Parts Needed For Rear Wall Channel Assembly (1) Mid Frames/Studs 9003 Stud (6) 9365 Front Wall Channel (2) Wearing gloves, bend the 2 tabs on each mid wall channel down. Fasten side wall channel assem- blies to the sides of building at the STEP splice and corner posts using screws.
  • Page 22 8735 Side Siding (5 board) (8) Step 9 Parts Needed For 5320 Side Siding (3 board) (4) 8736 Rear Siding (5 board) (4) Side/Rear/Front Siding 5307 Rear Siding (3 board) (2) 8737 Front Siding (5 board) (4) 5291 Front Siding (3 board) (2) Each screw in the wall requires a washer.
  • Page 23 7858 Large Right Gable (2) 7859 Large Left Gable (2) Step 10 Parts Needed For 6114 Small Right Gable (2) 6115 Small Left Gable (2) Gable Assemblies 6085 Roof Beam Bracket (4) ZS23 7860 Mid Gable Brace (4) The gables go on top of the front and 69835 Green Edge Trim rear walls to support the roof beams.
  • Page 24 Left Gable Assemblies (2) Step 11 Parts Needed For Right Gable Assemblies (2) Gables/Roof Beams Single Roof Beam (4) 6636 Gable Brace (2) Lift and fasten a right and left gable, under angle at corner, to the door track and rear wall angle with screws. Hint: On the front gable, leave out 2 screws closest to center gable leg.
  • Page 25 Step 12 Parts Needed For Main Roof Beam (1) Roof Beam/Braces 6227 Roof Beam Brace (2) STEP Fasten the track supports to the front gable assembly only, as shown. Wrap the weather stripping tape around the two joined edges of the large left and right gables.
  • Page 26 Step 13 Parts Needed For 7952 Right Roof Panel (1) Right Roof Panel AI26 Installing the roof panels is best done with a step ladder. Begin installing roof panels at the back right corner of the building. Each screw and bolt in the roof requires a washer.
  • Page 27: Roof Assembly

    Step 14 Parts Needed For 7953 Left Roof Panel (1) Roof Assembly 7954 Roof Panel (4) Screws To Roof Beam Install a left roof panel at the left rear corner of the roof. Install four roof panels in the sequence and positions shown on Screws To previous page.
  • Page 28 Step 15 Parts Needed For 8742 Ridge Cap (6) Ridge Caps & Panels 7953 Left Roof Panel (1) 7952 Right Roof Panel (1) Install three ridge caps on the completed roof section using bolts and nuts. Do not fasten the ends of STEP ridge caps until instructed to do so.
  • Page 29 Step 16 Parts Needed For 8743 Side Roof Trim (4) Roof Trim Attach the side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap. NOTE A single screw fastens both trim pieces at the overlap.
  • Page 30: Door Assembly

    3719 Door Handle Brace (2) Step 17 Parts Needed For 10475 Right and Left Doors (2) Door Assembly 10497 Horizontal Door Brace (4) D30ctr 6278 Vertical Door Brace (2) (12) The steps on this page tell how to assemble the right door. You will per- form exactly the same procedures for the left door.
  • Page 31 Step 18 Parts Needed For Right Door Assembly (1) Door Installation & Adjustment Left Door Assembly (1) A31ctr Horizontal Door Brace Gable Door Track Door Slide From inside the building, put the bottom of the right door assembly (on your left when you are inside the building) behind door jamb into the front frame track.
  • Page 32 697.76092 A WH109 A WH109EU A AI32 Anchoring and Floor Frame Anchoring Anchor your building at this time. Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time. SOME FACTS ABOUT RUST 1.

This manual is also suitable for:

Wh109697.76092