1. Upon a call for heat, the gas pressure switch(es) must be closed.
2. Once the gas pressure switch(es) are closed, the control turns
on the appropriate pumps (system and boiler pumps for space
heating,
DHW
The flow switch and/or LWCO must close.
3. The
control
turns
The louver proving switch, air pressure switch, and blocked
drain switch must close.
4. The control starts a 15 second prepurge cycle by initiating the
blower.
5. The control starts a 4 second trial for ignition by firing the spark
electrode and opening the gas valve.
6. If flame is not detected within 1 second after the sparking ends,
the control will perform a 10 second post-purge, then start
another prepurge cycle and try to light the burner again. On the
501 and larger models, the control will lock out if this second
attempt also fails. On the 400 model, the control will perform a
total of 4 attempts before locking out.
7. If flame is detected, it holds the firing rate steady for 5 seconds
to let the flame stabilize, then it begins to modulate the firing rate
based on a set point or some other command (such as a 0-10V
BMS signal).
pump
for
on
power
to
the
louver
Installation & Operation Manual
(continued)
DHW).
relay.
DISPLAY
65

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

801Knight xl 501Knight xl 601Knight xl 701

Table of Contents