Prepare Boiler; Remove Boiler From Wood Pallet; Gas Conversions; Model 400 - Lochinvar 400 Installation & Operation Manual

Lochinvar boiler user manual
Table of Contents

Advertisement

2

Prepare boiler

Remove boiler from wood pallet

1. After removing the outer shipping carton from the boiler,
remove the parts box.
2. Remove the front door to access the lag bolts in front of
the unit (FIG. 2-1).
3. To remove the boiler from the pallet (after removing the
front door):
a.
Remove the two lag bolts from the wood pallet
inside the boiler (FIG. 2-1).
b.
Detach the boiler from the lag bolts in the rear of the
unit, see FIG. 2-1.
Do not drop the boiler or bump the jacket
NOTICE
on the floor or pallet. Damage to the
boiler can result.
Figure 2-1 Boiler Mounted on Shipping Pallet

Gas conversions

For a boiler already installed, you must
WARNING
turn off gas supply, turn off power and
allow boiler to cool before proceeding. You
must also completely test the boiler after
conversion to verify performance as
described under Start-up, Section 10 of
this manual. Failure to comply could result
in severe personal injury, death, or
substantial property damage.
For the 400 Model you must install a
propane orifice to operate the Knight XL
on propane gas. Verify when installing that
the orifice size marking matches boiler size
(Model 400 - 8.0 LP orifice stamping).
Models 501 - 801 do not require an orifice
installation for propane operation, but
they will require a valve adjustment.

Model 400

1. Remove the top and front access covers from the unit (no
2. Remove the three screws securing the venturi to the blower.
3. Remove the four star-drive screws securing the gas valve to
4. Locate the propane orifice disk from the conversion kit bag.
5. Remove the existing orifice from the O-ring in the side of the
6. Reposition the gas valve against the venturi and replace the
7. Inspect the O-ring inside the blower. Handle the O-ring
8. After installation is complete, attach the propane conversion
9. Replace the top and front access covers.
. 2
Figure 2-2 Installing Propane Orifice - Model 400
Installation & Operation Manual
tools required for removal).
Note: When separating the venturi from the blower, take
care not to damage the O-ring inside the blower (FIG. 2-2).
the venturi (FIG. 2-2).
Verify that the stamping on the orifice disk matches the
boiler size (Model 400 - 8.0 LP orifice stamping).
gas valve and replace it with the orifice from the kit. Position
and secure the orifice in the valve as shown in FIG. 2-2.
star-drive screws (FIG. 2-2) securing the valve to the venturi.
with care, do not damage. Reposition the venturi against the
blower and replace the screws securing the venturi to the
blower (FIG. 2-2).
label (in the conversion kit bag) next to the boiler rating
plate. Attach the LP caution label (in the conversion kit bag)
to the left side of the unit in the lower left corner.
After converting to LP, check combustion per
WARNING
the Start-up procedure in Section 10 of this
manual.
combustion could result in severe personal
injury, death, or substantial property
damage.
Model 400: Inspect the O-ring when the
DANGER
blower is disassembled. The O-ring must be
in good condition and must be installed.
Failure to comply will cause a gas leak,
resulting in severe personal injury or death.
BLOWER
O-RING
SCREWS
O-RING
QTY. 4
BRASS ORIFICE
Failure to check and verify
VENTURI
SCREWS
QTY. 3
GAS VALVE
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

801Knight xl 501Knight xl 601Knight xl 701

Table of Contents