Maintenance; Maintenance And Annual Startup - Lochinvar 400 Installation & Operation Manual

Lochinvar boiler user manual
Table of Contents

Advertisement

12

Maintenance

Maintenance and annual startup

Table 12A Service and Maintenance Schedules
Service technician
(see the following pages for instructions)
General:
• Address reported problems
• Inspect interior; clean and vacuum if
necessary;
• Clean condensate trap and fill with fresh
water
• Check for leaks (water, gas, flue,
condensate)
• Verify flue and air lines in good condition
and sealed tight
• Check system water pressure/system
piping/expansion tank
• Check control settings
• Check
ignition
electrodes (sand off any deposits; clean
and reposition)
• Check wiring and connections
• Perform
performance verification per Section 10.
• Flame inspection (stable, uniform)
• Flame signal (at least 10 microamps at
high fire)
• Clean the heat exchanger if flue
temperature is more than 54°F (30°C)
above return water temperature.
If combustion or performance
indicate need:
• Clean heat exchanger
• Remove and clean burner using
compressed air only
• Clean the blower wheel
72
and
flame
sense
start-up
checkout
and
Installation & Operation Manual
Owner maintenance
(see the Knight XL User's Information Manual for
instructions)
• Check boiler area
Daily
• Check pressure/temperature
gauge
• Check vent piping
• Check air piping
Monthly
• Check air and vent termination
screens
• Check relief valve
• Check condensate drain system
• Check air vents
• Test low water cutoff (if used)
Periodically
• Reset button (low water cutoff)
• Check boiler piping (gas and
Every
water) for leaks
6 months
• Operate relief valve
End
• Shut boiler down (unless boiler
of season
used for domestic hot water)
months

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

801Knight xl 501Knight xl 601Knight xl 701

Table of Contents