Installing A Wall Mounted Direct Vent; Termination (5"/10") - Montigo P52DF Installation & Maintenance Manual

P series residential fireplace
Hide thumbs Also See for P52DF:
Table of Contents

Advertisement

P52DF* Indoor Gas Fireplace
Installing a Wall Mounted Direct
Section 3-3:
Vent Termination (5"/10")
This section applies to installations where the direct vent
termination will be wall mounted with 5" and 10" pipe.
1). Installation of Termination with built in frame under 8'
from the top of the unit.
A Termination with a Built-In Frame is installed during
framing of a structure.
1. Frame the termination opening to 17" x 17".
2. Install exterior sheathing to the structure framing.
3. Fasten the termination to the sheathing using a minimum of
4 screws.
Framing
Exterior
Sheathing
RHS 104
(Not shown)
17"
Figure 9. Installing a RTO-4F termination.
Installing Heat Guards over Terminations is recommended
in installations where the termination is located within 7'
feet above grade, or above a pedestrian walkway, and may
be Required by code in Public areas.
Figure 9a. Installing a RTO termination heat guard.
1. Ensure that the two long mounting brackets are facing
the bottom of the termination. (See inset). This will
provide more heat protection at the top of the termination,
where temperatures are highest.
2. Attach to the faceplate of the termination using four
sheet metal screws.
Page 12
Installation
"
17
Fastening Hardware,
minimum 4-screws
RTO-4F (5"/10")
Termination
RTKOG (5"/10")
Section 3-3-1: Installing a Wall Mounted Direct
Vent Termination (5"/8")
This section applies to installations where the direct vent
termination will be wall mounted with 5" and 8" pipe.
1). Installation of Termination with built in frame above 8'
from the top of the unit.
A Termination with a Built-In Frame is installed during
framing of a structure.
1. Frame the termination opening to 14" x 14".
2. Install exterior sheathing to the structure framing.
3. Fasten the termination to the sheathing using a minimum of
4 screws.
Framing
Exterior
Sheathing
RHS 101
14"
(Not shown)
Figure 10b. Installing a RTO-4F termination.
Installing Heat Guards over Terminations is recommended
in installations where the termination is located within 7'
feet above grade, or above a pedestrian walkway, and may
be Required by code in Public areas.
Figure 10c. Installing a RTO termination heat guard.
1. Ensure that the two long mounting brackets are facing
the bottom of the termination. (See inset). This will
provide more heat protection at the top of the termination,
where temperatures are highest.
2. Attach to the faceplate of the termination using four
sheet metal screws.
"
14
Fastening Hardware,
minimum 4-screws
PTO-4F (5"/8")
Termination
MTKOG (5"/8")
XG0196 - 150204.3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents