IVT 12KHR-N Service Manual page 31

Split type air to air heat pump
Table of Contents

Advertisement

2. Procedure for determining defective expansion valve
Checker
5.6K 5.6K 5.6K 5.6K
6
5
4
3
2
Connector
J.S.T. XAP-06V-1
Terminal
SXA-001T-P0.6
3. Diode bridge check method
Turn off the power and let the inverter electrolytic capacitor (C9, C10) discharge completely. Then use a tester and check continuity.
When using a digital tester, the (+) and (-) tester lead wires in the table must be reversed.
4. Inverter electrolytic capacitor (C9, C10) check method
Turn off the power, let the inverter electrolytic capacitor (C9, C10) discharge completely, and remove the capacitor from the control printed circuit
board (PWB). First, check the case for cracks, deformation and other damages. Then, using a needle-type tester, check continuity.
The tester needle should move on the scale and slowly returns to the original position. The tester needle should move
in the same way when polarities are reversed. (When measurement is taken with the polarities reversed, the tester
needle exceeds the scale range. Therefore, let the capacitor discharge before measurement.)
LED
(red)
Replace control PWB.
1
4 5
Determination of normal condition
Measure resistance in expansion valve coil.
Normal resistance between red
terminal of expansion valve
lead wire and each terminal:
about 46 (at 20
Insert checker shown at left into
connector (CN12) on control PWB, and
operate air conditioner.
Do LEDs on checker light in orderly
NO
sequence
(lighting of 1 LED => lighting of 2 LEDs)
If frost accumulates on 2-way valve after 10 to 20
minutes of cooling operation, then thermistors with
yellow and black lead wires may be defective. Check
these thermistors.
Needle-type tester
Normal resistance value
B
Value in ( ) is for digital tester.
3 – 9
)
YES
YES
(several M )
12KHR-N
NO

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents