Installing Electrode Holder And Work Clamp; Weld Output Cables - Hobart STICKMATE LX Owner's Manual

225 ac/dc and 225 ac
Table of Contents

Advertisement

3-5. Installing Electrode Holder And Work Clamp

1
Tools Needed:
1/2 in
1/4 in

3-6. Weld Output Cables

NOTE
OM-316 Page 14
3
2
4
6
9
7
For weld output cable replacements or extensions, contact your Factory
Authorized Service Agent.
Return To Table Of Contents
5
8
Y Turn Off unit and disconnect
input power before installing
electrode holder or work
clamp.
Removing Barrel From Elec-
trode Holder
1
Electrode Holder
2
Barrel
3
Access Hole
4
Set Screw
Loosen set screw through access
hole and slide barrel away from
electrode holder.
Installing Electrode Cable and
Barrel onto Electrode Holder
5
Electrode Cable From Unit
(Has Bare Conductors on
End)
6
Terminal Screw
Back out terminal screw from elec-
trode holder. Insert electrode cable
through barrel into end of electrode
holder and tighten terminal screw
securely.
Move barrel toward electrode hold-
er and tighten set screw to secure
barrel in place.
Installing Work Cable onto Work
Clamp
7
Work Clamp
8
Work Cable From Unit (Has
Ring Terminal on End)
9
Mounting Bolt
Route work cable through work
clamp as shown and install onto
mounting bolt using supplied hard-
ware.
ST-802 251 / ST802 105-C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents