Section 5 − Installation; Selecting A Location; Installing Work Clamp - Hobart Handler 125 EZ Owner's Manual

Handler 125 ez and h-9b gun 115 v gasless flux cored wire feed welder
Hide thumbs Also See for Handler 125 EZ:
Table of Contents

Advertisement

.
A complete Parts List is available at www.HobartWelder.com

5-1. Selecting A Location

(460 mm)

5-2. Installing Work Clamp

.
Tools Needed:
7/16 in.
OM-923 Page 14
SECTION 5 − INSTALLATION
!
Do not move or operate unit
where it could tip.
18 in.
Connection hardware must be tightened with proper tools. Do not just
hand tighten hardware. A loose electrical connection will cause poor
weld performance and excessive heating of the work clamp.
1
6
2
5
7/16 in.
18 in.
(460 mm)
1
2
3
4
!
Special installation may be
required where gasoline or
volatile liquids are present −
see NEC Article 511 or CEC
Section 20.
1
Plug From Unit
2
Receptacle − NEMA Type
5−15R (Customer Supplied)
Locate unit near correct input
power supply.
804 122-C
1
Nut
2
Work Cable From Unit
3
Work Clamp
4
Screw
5
Work Clamp Tabs
6
Insulator Grip
Slide one insulating grip over work
cable before connecting to clamp.
Attach cable to clamp with supplied
hardware.
Bend tabs around work cable.
Slide insulating grips over handles.
Ref. 802 456

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

H?9bHandler 140H100s2-10Handler 190H100s4-10

Table of Contents