Section 4 − Installation; Installing Work Clamp; Process/Polarity Table; Polarity - Hobart Handler 125 EZ Owner's Manual

Hide thumbs Also See for Handler 125 EZ:
Table of Contents

Advertisement

4-1. Installing Work Clamp

.
Tools Needed:
7/16 in

4-2. Process/Polarity Table

Process
FCAW − Self-shielding wire −
no shielding gas

4-3. Polarity

SECTION 4 − INSTALLATION
Connection hardware must be tightened with proper tools. Do not just
hand tighten hardware. A loose electrical connection will cause poor
weld performance and excessive heating of the work clamp.
1
6
2
5
7/16 in
Polarity
DCEN − Straight Polarity
1
3
4
Cable Connections
Cable To Gun
Connect to negative (−)
output terminal
1
Nut
2
Work Cable From Unit
3
Work Clamp
4
Screw
5
Work Clamp Tabs
Bend tabs around work cable.
6
Insulator Grip
Slide one insulating grip over work
cable before connecting to clamp.
Slide insulating grips over handles.
Ref. 802 456
Cable To Work Clamp
Connect to positive (+) output
terminal
.
Polarity must be set for DCEN
(flux core wire) only.
1
Lead Connections For Direct
Current Electrode Negative
(DCEN)
Always read and follow wire
manufacturer's recommended
polarity, and see Section 4-2.
Close door.
Ref. 210 428
OM-923 Page 13

Advertisement

Table of Contents
loading

This manual is also suitable for:

H-9b gun

Table of Contents