Lincoln Electric RANGER SVM148-B Service Manual page 93

Lincoln electric welder user manual
Table of Contents

Advertisement

F-34
AUXILIARY AND FIELD WINDING TEST (continued)
15 AMP
CB LEADS
#3A AND #3B
LOCATED ON
REAR OF PANEL
TEST PROCEDURE
To test the 115 VAC winding:
1. With the 5/16" and 3/8" nut drivers, remove
the case left side.
2. Make sure that the LOCAL/REMOTE switch
(S8) is in the CONTROL AT WELDER posi-
tion.
3. Set the voltmeter to the AC volts position.
4. Connect the volt/ohmmeter probes to leads
#3A and #3B where they connect to the 15
amp circuit breakers. See Figure F.9.
5. Start the engine and run it at high idle (3700
RPM).
6. Set the output control to the maximum
position (position 10).
7. Check the AC voltage reading. It should be
approximately 125 VAC.
TROUBLESHOOTING & REPAIR
FIGURE F.9 – LOCATION OF LEADS #3A AND #3B
RANGER 300 D AND 300 DLX
To test the 230 VAC winding:
1. With the 5/16" and 3/8" nut drivers, remove
the case left side.
2. Set the voltmeter to the AC volts position.
3. Connect the volt/ohmmeter probes to leads
#6 and #3 where they connect to the 50
amp circuit breakers.
Diagram.
NOTE: It is easier to insert the probes directly
into the receptacle to perform this test.
However, the probes may not reach in far
enough to make or keep a good connection.
4. Start the engine and run it at high idle (3700
RPM).
5. Set the output control to the maximum
position (position 10).
6. Check the AC voltage reading. It should be
approximately 240 VAC.
F-34
See the Wiring

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ranger 300 dRanger 300 dlx

Table of Contents