Rinnai Prestige Operation & Installation Manual page 27

Close coupled solar hot water systems
Table of Contents

Advertisement

Fastening Cylinder to Roof
Lift the storage cylinder onto the roof and
locate it above the collector bank� The
cylinder's position should be as central as
possible to the collector bank� The lower rail
must be on a load bearing surface�
Slide the cylinder support strap into the slots
located in the uppermost cylinder support
bracket so that the strap is in line with a
suitable fastening position
Tiled Roof
Remove tiles one row up from the storage
cylinder� Apply tension to the straps and attach
them to the rafters using a suitable fastener�
Replace the tiles
Metal Roof
Bolt the lower support rail to the roof using a
suitable fastener�
Apply tension to the cylinder support straps
and attach them to the rafters using a suitable
fastener�
Seal any holes in roof using a suitable sealant
to ensure roof is water tight�
Rinnai
InsTallaTIon - all sysTeMs
TILE
REMOVED
FASTEN STRAP
TO RAFTER
BOLT STRAP TO ROOF USING
A SUITABLE FASTENER
LOWER CYLINDER RAIL MUST BE
LOWER CYLINDER RAIL MUST BE
ON A LOAD BEARING SURFACE
ON A LOAD BEARING SURFACE
27
LOWER CYLINDER RAIL
MUST BE ON A LOAD
BEARING SURFACE
BOLT RAIL TO ROOF USING
A SUITABLE FASTENER
CC OIM Issue 9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

SunmasterEquinox

Table of Contents