General Design Layout / Carton Contents; Operation - Rinnai ORH15S Operation & Installation Manual

Outdoor radiant heater
Table of Contents

Advertisement

GENERAL DESIGN LAYOUT / CARTON CONTENTS

4
The packaging for this appliance should contain:
1.
Outdoor Radiant Heater: a. Heater body b. Front radiating surface.
2.
1000mm Flexible power cord with three pin plug
3.
Operation Indicator Light
4.
Adjustable angle mounting bracket
5.
Mounting bracket locking plates (x2)
6.
Operating & Installation Instructions

OPERATION

1.
Before operating the heater for the
clean and free of debris or dust see "Cleaning" on page 12.
2.
Ensure that the GPO for the heater is in the "ON" position, then switch "ON" the power at the isolating switch
(if
3.
The orange operation indicator will light to indicate the heater is on and the heater will begin to radiate infrared
heat.
The heater may take up to 15 minutes to reach maximum heat, depending on the area being
heated and the conditions.
NOTE
4.
Switch "OFF" the power at the isolating switch to turn off the heater. The operation indicator will go out.
The heater may take up to 30 minutes to fully cool down, depending on the area being heated and
the conditions.
NOTE
Rinnai
4
1b
time or after periods of non use ensure that the radiating surface is
ABOUT YOUR OUTDOOR RADIANT HEATER
5
3
(x2)
7
6
1a
5
2
ORH OIM

Advertisement

Table of Contents
loading

This manual is also suitable for:

Orh24lOrh18mOrh32xl

Table of Contents