Installation Requirements; Certification; Carton Contents - Rinnai Energysaver RHFE-556FTR Operation And Installation Manual

Energysaver series
Hide thumbs Also See for Energysaver RHFE-556FTR:
Table of Contents

Advertisement

INSTALLATION REQUIREMENTS

This heater must be installed by an authorised person. The installation must conform to local regulations.
The installation must also comply with the instructions supplied by Rinnai.
Service and removal must be carried out by an authorised person.
The Rinnai Energysaver
The AGA Certification Number is shown on the appliance dataplate.
No parts or functions should be modified or permanently removed from the heater.
Please keep these instructions in a safe place for future reference.
Check you have the following:
1 x Rinnai Energysaver Space Heater - Model either:
RHFE-556FTR/FDT, RHFE-557FTR, RHFE-1004FTR or RHFE-1004FDT
1 x Rear Cover set, comprising of left, right and top cover panels
1 x Bolt pack containing;
Stainless steel sheath clamp
2 x securing brackets
2 x 8g x 30 mm stainless steel securing bracket screws
2 x plastic inlet hose clamps
1 x 150 mm long cable tie
1 x HD stainless steel flue clamp
2 x 6g x 10 mm button head screws
4 x 6g x 8 mm pan head screws.
For Flueing details, please refer to seperate Energysaver Co-Axial Flueing Installation
Manual'.
IMPORTANT
Rinnai Australia

CERTIFICATION

®
Range have been certified by the Australian Gas Association.

CARTON CONTENTS

Energysaver® - Operation & Installation Manual
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents