Filling The System / Filling The Siphon - Wolf MGK-130 Technical Manual And Installation Instructions

Gas condensing boilers
Table of Contents

Advertisement

Fill the system and vent it correctly in line with the details
in the chapter "Water treatment" to ensure the perfect
function of the condensing boiler (see page 30).
Before connecting the gas condensing boiler,
NB
flush the heating system to remove residues
such as welding pearls, hemp, putty, etc. from
the pipework.
• The gas tap must be shut.
• Open the air vent valves.
• Open all heating circuits.
• Open all radiator or mixer valves.
• Slowly fill the entire heating system and boiler when
cold, for example via the BDF valve at the return, to
approx. 2 bar pressure.
Inhibitors are not permissible.
NB
• Open the flow valves on the condensing boiler.
• Fill the heating system to 2 bar pressure. In operation,
the pressure gauge must indicate between 1.5 and
5.5 bar.
• Check the entire system for water leaks.
• Remove the siphon.
• Fill the siphon with water.
• Refit the siphon.
• Start the condensing boiler, set the heating water
selector to position "2" (pump running, illuminated
status indicator ring constantly green).
• Vent the heating circuit; for this, switch the gas
condensing boiler ON and OFF again several
times.
• Top up with water when the system pressure falls
substantially.
• Open the gas ball valve.
• Press the reset button.
Note:
In constant mode, the heating circuit is
automatically vented via the air vent valve
(accessory).
The condensate hose attached to the siphon
NB
must not form a loop or roll up, otherwise the
operation might be impaired.
22

Filling the system / filling the siphon

ON/OFF switch
Reset button
Fig.: Control unit overview
BDF valve
Fig.: (BDF valve)
Fig.: Siphon
Thermometer
Water pressure switch
Siphon
3062880_0910

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mgk-170Mgk-250Mgk-300Mgk-210

Table of Contents